Monthly Operating Rept for Feb 1981
ML19345G270
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/05/1981
From: Harran G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19345G269 List:
References
NUDOCS 8103170666
Download: ML19345G270 (4)


Text

.

j.

AVER AGE DAILY UNIT POWER LEVEL cx

,d l

DOCKET NO.

50-245 UNIT Unit 1 810305 DATE an COMPLETED BY TELEPHONE (203)447-1791 X655 MONDI February DAY AVERAGE D ILY P WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1 0

17 0-2 0

18 0

3 0

19 0

0 20 0

5 0

21 0

6 0

22 0

0 7

0 23 8

0 24 0

25 0

10 0

26 0

!l 0

27 0

1 n

28 n

13 0

29 14 0

30 O

31 16 0

INSTRUCEONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Co the nearest whole rnegawatt.

(9/771 81031 78

  • ,.~

U OPERATING DATA REPORT

~

DOCKET No. 50-245

  1. U3 DATE

~

- COh1PLETED BY Gg"99e.791 rr.a c TELEPHONE t Xbbb ~

OPERATING STATUS

~

' Notes I. Unit Name:

Millstone Uni 1

2. Reporting Period: February 1981
3. Licensed Thermal Powce i:

2011 r

4. Nameplate Rating (Gross alhej:

662

5. Design Electrical Rating (Net h1we): 660 684
6. hf'ximum Dependable Capacity (Gross 5!We):

_654

7. Stasimum Dependable Capacity (Net h!We):
8. If Changes Occur in Capacity Ratings (It ;ns Number 3 Through 7)Since Last Report.Gise Reasons:

N/A N/A

9. Power Level To Which Restricted.'If Any (Net h!We):

N/A

10. Reasons For Restrictions.If Any:

N/A N/A N/A

' Iltis hionth Yr to Date Cumularise

~

, II. Hours in Reporting Period 672 1416

' e.

89880

72. Number Of Hours Reactor Was Critical 0

0n 6Ad% 0

13. Reactor Resene Shutdown Hours 0

0.' 0 1527.3

- 14. Hours Generator On Line 0

0.0 64126.2

15. Unit Resene Shutdown Hours 0

0.0 26.5

16. Gross Thermal Energy Generated (h!WH) 0 U.u 314430127
17. Gross Electrical Energy Generated (51WH) 0 0

38795896

18. Net Electrical Energy Generated (51WH) 0 (-1943)

-3971 3/025983

19. Unit Senice Factor 00 0.0 71.3
70. Unit Availability Factor 0.0 0.0 71.4
21. Unit Capacity Factor (Using h!DC!nt) nn 0.0 63.0
22. Unit Capacity Factor (Using DER Net) 0n 0.0 62.4
23. Unit Forced Outage Rate 0.0 0.0 15.4-
24. Shutdowns Scheduled Oser Next 6 hionths.T pe.Date.and Duration of Each):

3 N/A N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

March 28, 1981

26. Units In Test Status (Prior to Commercial Operation):

Fosecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY N/A COSistERCI AL OPTH ATION f.

('l/77 )

P00R OR M

4 UNITSilUTDOWNS AND POWER REDUCTIONS

' DOCKET NO.

50-245 UNIT N AM E - Mi l l s to ne 1 DATE 800j05 REPORT MONTil February COMPLETED 11Y TELEPif0NE (2UJ)44/-1/91 Ataab EM g

-y ant.

.! E 3

.Y k Licensee gg, h*.

No.

Date p

g

,g g 5 Event

T E3 Cause & Corrective U" '

E dE 5

jdg Report #

r#0 jU Prevent Recurrence d

Action to y

6 (M

10d

801004, S

672 L

N/A R0-81-01/IP SF PIPEXX FLAW IN A PIPE WELD BETWEEN THE Cc PRIMARY CONTAINMENT PENETRATION A

AND THE INBOARD ISOLATION CHECK VALVE.

REPLACE AFFECTED PIPE.

(LPCI. SYSTEM) e s

I 2

F: Forced Reason:

Method:

3 4

S: Scheduled A Equipment Failure (Explain)

ExhiFt C - Instructions ll Maintenance of Test 1 Manual for Preparation of Data C-Refueling 2-Manual Scram.

D Regulatory Restriction 3 Automatic Scram.

Entry Sheets for Lvensee 1

Event Report (LER) File (NUREG.

i, E-Operator Training & Ucense Examination 4 Other(Explain) 0161)

F Administrative (9/77)

C. Operational Error (Explain) t 11 Other(Explain)

Exhibit I-Same Source l

., b ;

REFUEL.It G IflFORf'ATION REf)UF

'l.

Name of facility: _31111sfonti 2.

Scheduled date for next refueling shutdown:

Sumer 1982 3.

Scheduled date for restart foll,owing refueling:

Fall 1982

~

4..

Will refueling or res6mption of ' peration thereafter require a technical o

specification change or other license amendment?

Yes. TechnicalSpecificationchangesredarding:

(1) flaximum average planar linear heat genera:.ing rate (2) 11aximum critical power ratio 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Spring 1982

, 6.

Important licensing consir'erations associated hith refueling, e.g.,,new or different fuel design or - oplier, unreviewed design or performance analysis methods, significi.nt chan_ ; in fuel design, new operating procedures:

17h "Rotrnfit" 8 x 8 fuel as'semblies are' scheduled for insertion in cycin 4 (Reload 8)

~ 7.

The number of fuel assemblies (a).in the core and (b) in tiie spent fuel storage pool:

(a)InCore:

~ 580' (b) In SFP:~ -- qu 8.

The present licens._d spent fuel pool storage capacity and the size of any in-ciease in licensed storage capacity that has been requested or is planned, in

. number of fuel assemblies:

2184 Assemblie's~

~

9.

.The projected date of the last refueling that can be discharged to the spent fuel pool assuming the r 'sent licensed capacity:

1985, Spent funi ponl, fn B_ccee nff inadA nahil uy is-r-cached, 1991 Core full, spent fuel pool contains 2120 bundles.

.