ML19345G270
| ML19345G270 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/05/1981 |
| From: | Harran G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML19345G269 | List: |
| References | |
| NUDOCS 8103170666 | |
| Download: ML19345G270 (4) | |
Text
.
j.
AVER AGE DAILY UNIT POWER LEVEL cx
,d l
DOCKET NO.
50-245 UNIT Unit 1 810305 DATE an COMPLETED BY TELEPHONE (203)447-1791 X655 MONDI February DAY AVERAGE D ILY P WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1 0
17 0-2 0
18 0
3 0
19 0
0 20 0
5 0
21 0
6 0
22 0
0 7
0 23 8
0 24 0
25 0
10 0
26 0
!l 0
27 0
1 n
28 n
13 0
29 14 0
30 O
31 16 0
INSTRUCEONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Co the nearest whole rnegawatt.
(9/771 81031 78
- ,.~
U OPERATING DATA REPORT
~
DOCKET No. 50-245
- U3 DATE
~
- COh1PLETED BY Gg"99e.791 rr.a c TELEPHONE t Xbbb ~
OPERATING STATUS
~
' Notes I. Unit Name:
Millstone Uni 1
- 2. Reporting Period: February 1981
- 3. Licensed Thermal Powce i:
2011 r
- 4. Nameplate Rating (Gross alhej:
662
- 5. Design Electrical Rating (Net h1we): 660 684
- 6. hf'ximum Dependable Capacity (Gross 5!We):
_654
- 7. Stasimum Dependable Capacity (Net h!We):
- 8. If Changes Occur in Capacity Ratings (It ;ns Number 3 Through 7)Since Last Report.Gise Reasons:
N/A N/A
- 9. Power Level To Which Restricted.'If Any (Net h!We):
N/A
- 10. Reasons For Restrictions.If Any:
N/A N/A N/A
' Iltis hionth Yr to Date Cumularise
~
, II. Hours in Reporting Period 672 1416
' e.
89880
- 72. Number Of Hours Reactor Was Critical 0
0n 6Ad% 0
- 13. Reactor Resene Shutdown Hours 0
0.' 0 1527.3
- 14. Hours Generator On Line 0
0.0 64126.2
- 15. Unit Resene Shutdown Hours 0
0.0 26.5
- 16. Gross Thermal Energy Generated (h!WH) 0 U.u 314430127
- 17. Gross Electrical Energy Generated (51WH) 0 0
38795896
- 18. Net Electrical Energy Generated (51WH) 0 (-1943)
-3971 3/025983
- 19. Unit Senice Factor 00 0.0 71.3
- 70. Unit Availability Factor 0.0 0.0 71.4
- 21. Unit Capacity Factor (Using h!DC!nt) nn 0.0 63.0
- 22. Unit Capacity Factor (Using DER Net) 0n 0.0 62.4
- 23. Unit Forced Outage Rate 0.0 0.0 15.4-
- 24. Shutdowns Scheduled Oser Next 6 hionths.T pe.Date.and Duration of Each):
3 N/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March 28, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Fosecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY N/A COSistERCI AL OPTH ATION f.
('l/77 )
P00R OR M
4 UNITSilUTDOWNS AND POWER REDUCTIONS
' DOCKET NO.
50-245 UNIT N AM E - Mi l l s to ne 1 DATE 800j05 REPORT MONTil February COMPLETED 11Y TELEPif0NE (2UJ)44/-1/91 Ataab EM g
-y ant.
.! E 3
.Y k Licensee gg, h*.
No.
Date p
g
,g g 5 Event
- T E3 Cause & Corrective U" '
E dE 5
jdg Report #
r#0 jU Prevent Recurrence d
Action to y
6 (M
10d
- 801004, S
672 L
N/A R0-81-01/IP SF PIPEXX FLAW IN A PIPE WELD BETWEEN THE Cc PRIMARY CONTAINMENT PENETRATION A
AND THE INBOARD ISOLATION CHECK VALVE.
REPLACE AFFECTED PIPE.
(LPCI. SYSTEM) e s
I 2
F: Forced Reason:
Method:
3 4
S: Scheduled A Equipment Failure (Explain)
ExhiFt C - Instructions ll Maintenance of Test 1 Manual for Preparation of Data C-Refueling 2-Manual Scram.
D Regulatory Restriction 3 Automatic Scram.
Entry Sheets for Lvensee 1
Event Report (LER) File (NUREG.
i, E-Operator Training & Ucense Examination 4 Other(Explain) 0161)
F Administrative (9/77)
C. Operational Error (Explain) t 11 Other(Explain)
Exhibit I-Same Source l
- ., b ;
REFUEL.It G IflFORf'ATION REf)UF
'l.
Name of facility: _31111sfonti 2.
Scheduled date for next refueling shutdown:
Sumer 1982 3.
Scheduled date for restart foll,owing refueling:
Fall 1982
~
4..
Will refueling or res6mption of ' peration thereafter require a technical o
specification change or other license amendment?
Yes. TechnicalSpecificationchangesredarding:
(1) flaximum average planar linear heat genera:.ing rate (2) 11aximum critical power ratio 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Spring 1982
, 6.
Important licensing consir'erations associated hith refueling, e.g.,,new or different fuel design or - oplier, unreviewed design or performance analysis methods, significi.nt chan_ ; in fuel design, new operating procedures:
17h "Rotrnfit" 8 x 8 fuel as'semblies are' scheduled for insertion in cycin 4 (Reload 8)
~ 7.
The number of fuel assemblies (a).in the core and (b) in tiie spent fuel storage pool:
(a)InCore:
~ 580' (b) In SFP:~ -- qu 8.
The present licens._d spent fuel pool storage capacity and the size of any in-ciease in licensed storage capacity that has been requested or is planned, in
. number of fuel assemblies:
2184 Assemblie's~
~
9.
.The projected date of the last refueling that can be discharged to the spent fuel pool assuming the r 'sent licensed capacity:
1985, Spent funi ponl, fn B_ccee nff inadA nahil uy is-r-cached, 1991 Core full, spent fuel pool contains 2120 bundles.
.