Text
i s
CONNECTICUT Y A N K EE ATO MIC POWER COMPANY Jf 5\\ 'n \\ ~ '.7 HADDAM NECK PLANT RR 41. DOX 127E. EAST HAMPTON, CONN. o6424 N%W]
May 24, 1974 CYH-2665
. :c y
1/Rh
'S' NY
f-n c ftgnh Mr. James P. O'Reilly, Director e
.t g
Region I Directorate of Regulatory Operations js/
/;
U. S. Atomic Energy Commission M
" f f ~1,7f..., '-,,
+
631 Park Avenue King of Prussia, Pennsylvania 19406 Dear Mr. O'Reilly; As defined by Technical Specifications for Connecticut Yankee Atomic Power Station, Section 5.3, the following information concerning drift of protective instrumentation trip settings is hereby reported.
During a routine bi-monthly nuclear instrumentation over power tr'n set point check, two of four overpower trip set points were found 1% over the required 109%. The two set points were re-adjusted to approximately 108%.
A final report will be submitted within ten days.
Very truly yours, B/J gF.W.Hartley men Plant Superintenden MAY 29 IW4 N.
PM/bn
,sgg$ t
/
nonam 1
E-c'
/
REGULATORY DOCKET FILE COPY g.7g f /630900~7 l
.