Updates 750527 Response to IE Bulletins 75-04 & 75-04, Cable Fire at Browns Ferry Nuclear Power Plant. Fifty Percent of Deficient Floor & Wall Penetration Seals Corrected.Fire Prevention & Suppression Equipment Reviewed
ML19345G148
Person / Time
Site: Big Rock Point, Palisades  File:Consumers Energy icon.png
Issue date: 06/26/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-75-04, IEB-75-04A, IEB-75-4, NUDOCS 8103060788
Download: ML19345G148 (1)


Text

o pe ne.

37;.

U xv uds '.n o W

/

[

p-...-

(

i v.I.

i.

reen m

u. u.,a b y

-s v

General Off.ces 212 West MicNgan Avenue. Jackson. MicNgan 49201. Area Code S17 788-OSSO June 26, 1975 Mr. J. G. Keppler Re: Dockets 50-155 &

US Nuclear Regulatory Co==ission 50-255 799 Roosevcit Road Licenses DPR-6 &

Glen Ellyn, IL 60137 DPR-20

~

Dear Mr. Keppler:

By letter dated May 27, 1975, Consumers Power Company responded to IE Bulletins 75-04 and 75-OhA for the Big Rock Point and Palisades Plants.

Two responses were inco=plete. The purpose of this letter is to update these responses.

Approximately 50% of the deficient floor and vall penetration seals has been corrected at Palisades at this writing. More caterials vere required than were originally esticated. These materials are on order and the remainder of the seals vill be completed by July 31, 1975 At Big Rock Point, two proposals are be.ing evaluated for the installation of floor and vall penetration seals for cable penetrations through the floor of the control room and the vall between the air com-pressor room and cable penetration. At present, no schedule is available for thio installation.

l The review of fire prevention n'nd fire suppression equipment has i

been completed for the Palisades Plant. The reco:cendations of the re-viewer are bein6 evaluated for possible procure =ent of equipment.

f At Big Rock Point, we are investigating the possibility of l

installing smoke detectors and water spray equip =ent in the cable pene-l tration room outside of contain=ent. Because of the preliminary nature l

of this investigation, a schedule has not yet been established.

l We vill provide a further response regarding these two items within thirty days.

Yours very truly,

,n

(

c%yd

'xw l

l RBS/ds Ralph B. Sewell i

Nuclear Licensing Administrator CC: Div of Reactor I

l Licensing yQGQ [

L

.t d *J

.