Updates Responses to IE Bulletins 75-04 & 75-04A, Cable Fire at Browns Ferry Nuclear Power Plant. Seventy Percent of Deficient Floor & Wall Penetration Seals Corrected.Addl Air Breathing Equipment Ordered
ML19345G147
Person / Time
Site: Big Rock Point, Palisades  File:Consumers Energy icon.png
Issue date: 07/29/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-75-04, IEB-75-04A, IEB-75-4, IEB-75-4A, NUDOCS 8103060777
Download: ML19345G147 (1)


Text

r..

[' ^' A 09Ii3UCDIS i

r.-... I

(

e....

n......,;,

c.q.

~,,. p #

o.

, ome. m w.m u.eue.n 4..

.s.e.o,. wcw., 42oi. 4,.. coe. sense osso s

July 29, 1975 Mr James G. Keppler US Nuclear Regulatory Cc::cission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCrrtS 50-155 AND 50-255

-LICENSES DPR-6 A?;D DPR-20 BIG ROCK POINT AND PALISADES PLANTS The purpose of this letter is to update previous responses to IE Bulletins 75-04 and 75-OkA for the Big Rock Point and Palisades Plants.

Approximately 70% of the deficient floor and vall penetration seals have been corrected at Palisades at this writing. Work is in progress and it is esti-mated that another 10 to 15 working days are required for ce=pletion.

At present, the Big Rock Point M ant staff is continuing to evaluate two proposals for floor and vall penetration seals. One proposal consists of mineral vool, Marinite board and Fla=elr.stic. The other consists of a silicone RTV foam. No installation schedule has been developed.

The Palisados Plant staff is continuing to evaluate the recc==endations re-garding additional fire prevention and suppression equipment. Additional air breathing equip =ent has been ordered to enhance operator ability to shut down the plant if roo=s become smoke filled.

Vendor proposals have been solicited regarding additional fire detection and suppression equipment at the Big Rock Point Plant. After these proposals are received and reviewed, a schedule foi-installation vill be established.

r n

r

.Q -g,Csf&.

O' /.

c

/~

Ralph B. Sevell Nuclear Licensing Ad=inistrator CC:

File C

~

JUE 3 1 :0?5 h

7

o MEMO ROUTE SUP 5** =n o=~t ta'* -

  • r coacurr<:acS

'or actiaa-Form AEC.93 (Rev. Ma, i4. s94n AECM 0240 ror staatters.

For informatiea.

se,,, and retu n.

r To (Name and vans piir:ALs atMAmus IE Chie f, FS&EB Consumers Power Company IE:HQ(4)

Dars Palisades Plant 50-255 Licensing (4)

_DR Central Files J. Rizzo, OMIFC Big Rock Point 50-155 TO (Name and antt)

INTIAA.5 REMAAKS A/D for Info. Process ing Regt on I Region II are PDR Local PDR I

TO (N ame and unit)

(scTLA1.5 RLMAAKS R. Callen M. Cherry urc 4

FROM (Name and unst) ptM ARKS,

G. Fiore111 Attached is s copy of licensee's reply dated July 29, 1975, IE:III to IE Bulletins 75-04 and 75-04A.