Updates Responses to IE Bulletins 75-04 & 75-04A, Cable Fire at Browns Ferry Nuclear Power Plant. All But Three Deficient Floor & Wall Penetration Seals Corrected.Silicone Room Temp Vulcanizing Foam to Be Installed in 760109 Outage
ML19345G145
Person / Time
Site: Big Rock Point, Palisades  File:Consumers Energy icon.png
Issue date: 09/25/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-75-04, IEB-75-04A, IEB-75-4, NUDOCS 8103060759
Download: ML19345G145 (3)


Text

.

i i.

o.n.,.i on.c..: nin w..i meme.n Av.nv s.ca.on, miem.n 4o2o. Ar.. coa. ei7 7ee osso e

September 25, 1975 Mr James G. Keppler US Nuclear Regulatory C?rmission 799 Roosevelt Road

. Glen Ellyn, IL 60137 DOCKETS 50-155 & 50-255, LICENSES DPR-6 & DPR-20 BIG ROCK POINT & PALISADES PLANTS The purpose of this letter is to update previous responses to IE Bulletins 75-Oh and 75-OhA for the Bi6 Rock Point and Palisades Plants.

All but three of the deficient floor and vall penetration seals have been cor-rected at the Palisades Plant. Ventilation problems have precluded the comple-(

tion of these three penetration seals. These three vill be completed when the plant is in a shutdown condition, such that it is possible to shrt off venti-lation.

As stated previously, we plan to use a silicone RTV foam type material for the Big Rocle Point penetrations. This work will be performed during the outage presently scheduled to commence January 9, 1976.

We are procuring five additional dry chemical fire extinguishers and two additional CO2 fire extinguin, s to supplement existing fire fighting equipment at the Palisades Plant. A delivery schedule has not yet been established.

At the Big Rock Point Plant, a contract is being negotiated with W. E. Healey and Associates, Inc to install smoke detection equipment in the cable penetra-tion areas both inside and outside of containment and in the electrical equip-ment room and a water sprinkler system in the cable penetration room outside of containment. Drawings and procedures are presently being generated for Consumers Power Company's review and approval. It is anticipated that this work may be completed during the fall of 1975 In any event, it will be com-pleted no later than during the outage presently scheduled to commence January 9, 1976.

(

/

)

l' 2

In view of the fact that all corrective action ha's been defined and that this action is.either completed, in progress or scheduled, we plan no further monthly We will inform you updates to our responses to IE Bulletins 75-04 and 75-OhA.

when the actions have been completed at both plants.

,j'

.h -/3, kcLed-s,,

Ralph B. Sewell Nuclear Licensing Administrator CC: File

)

4

(

4 i

I I

i

[

i I

O b

i

(

t I

b

---e

Fem i e D *,.tt eI-79 i R D Att 9:c3

'- em I

MEf?.0 E00TE SilP S****cmt**+

'r<*".-***

l N.e...eee.-

a v....o.n ay w e-.e.s

,o..........,

~,-

n....,

IE Chie f. FS&EB consu ers Power Corpany IE:llQ(4)

Big Rock Point 50-155 Licensing (4)

~

~ ~DR Cent ral file sN.

ET ' 4-?a.

O'O PC -

Palisades Plant 50-255 t o o.....q...u mnaa u maa c A/D for Info. Proces sing Region I Region II PDR Tocal PDF to ch...u.us unaa u=uo R. Callen H. Cherry can F rom (h.e. and.ati st u am a.S C. Fiore111 Attached is a copy of licensee's reply dated Septe=ber 25, IE:III 1975, to IE Eulletin 75-04 and 75-04A.