ML19345G095
| ML19345G095 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 05/03/1976 |
| From: | Jeffery Wood PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| RO-76-05, RO-76-5, NUDOCS 8103020243 | |
| Download: ML19345G095 (1) | |
Text
LICENSEE EVENT REPORT \\
i
~
t CONTROL BLOCK:l l
l l
l l
(PLEASI PRINT ALL REQUIRED INFORMATION) 1 6
NAME LICENSE NUMBER ypg Ty 0
lC l A lH l Ml Bl 1l l0 l0 l-l 0 l 0l 0l 0l0 l-l0 l0 l l4l1l1l1l1l l 0l1 l 7 89 14 15 25 26 30 31 32 CATEGORY T PE oOCKET NUMBER EVENT DATE r*EPoRT DATE O 1 CON'T l D l I l W y l0 l5 l0 l-l0 l1l 3l 3l l0 l4 l1 l9 l 7 l 6 l l0 l5 l0 l3 l 7 [ 6 l 7 8 57 58 59 60 61 68 69 74 75 80 EVENT OESCRIPTION gg l During normal operation secondary containment required by the Technical Specificationq 7 89 80 gl III.B.8. was lost for several hours when a temporary plug was not installed in a l
80 7 89
~
seismic l
E[ l two inch diameter hole drilled in the refuel building wall as part of 7 89 80 3E I a gtfications. The special building leak rate test detected the problem and the l
7 89 80 gg l hole was plugged. Backup secondary containment is not available.
l 80 7 89 mg
$E CODE COMPONENT CODE SA R MANUF R
VOLAT 1DN
]E l S l Al [AJ l X l X l Xl XlX lX l
[AJ l Z l 9 l 9 l9 l y
7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION gg l Personnel error.
Failure to follow written instruction to plug hole shortly l
7 89 80 g[ l af ter drilling.
l 7 89 Bo HI l
's't aNs' o$dEo$tR$
% PowtA 01HER S1 Alus DiscosEm DEscwtsoN y
l 0l 8l 5l l NA l J lSpecial Refuel Building 1.eak Test l
1 7 8 9
10 12 13 44 45 46 60 RELE SED CF ASE AMOUNT OF ACINt1Y LOCATON OF RELEASE DE Lz.J LZJ l
NA I
I NA I
7 8 9
10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTON DE P I 0101
( 2]
l NA l
7 89 11 12 13 80 PERSONNEL INJURIES i
l NuMeta ce scarT ON gg l 0l0 l0 l l
NA l
7 89 11 12 80 OFFSITE CONSEQUENCES DE I NA l
7 89 80 LOSS CR OAMAGE TO FACILITY i
l tv54 of scpo!ON i
D2 (Z_j l
NA l
7 89 10 F30 nuoi cit y l NA l
i l
/ 09 HO ADDITIONAL F ACTORS gg l Event Description (cont) Third occurrence: re fer to 1.ER 76-02 and 76-03.
100%
j 60 7 8 %urveillance provided by QC inspector. Each plug is tagged as it is installed then gg linstalled plugs checked for tightness at end of work period (4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> rmv.) 1.En 76-05 ]
l 7 8V uH J. W. WOOD 707-443-2787 NAME PHONr
-