| Issue date: | 02/02/1981 |
| From: | Rich Smith VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| FVY-81-23, VY-5974, NUDOCS 8102180310 | |
| Download: ML19345F541 (2) | |
Text
.
r " r, " ' n r ~ u
a, b..
.j_/b 3
VERMONT Y.AN K MM N UCLEAR l *OW MR C()R l'OR ATi( >N P. O. BOX 157 GOVERNOR HUNT ROAD 2.C.2.1 VERNON VERMONT 05354 FVY 81-23 VY-5974 2 February 1981 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Office of Nuclear Reactor Regulation Mr. Thomas A.
Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors
REFERENCE:
(a)
License No. DPR-28 (Docket No. 50-271)
(b) USNRC letter to VYNPC dated January 14, 1981 I6E Inspection Report 50-271/80-21 Subj ect: Revision 2 to the Vermont Yankee. Physical Security Plan
Dear Sir:
This letter provides a revision to the Physical Security Plan in order to clarify some points and respond to an 1&E inspector's concerns.
In addition to the revision, a brief explanation (Attachment A) is provided to present the basis for the more significant changes to the plan.
All changes are delineated by a vertical line in the right hand margin.
We have determined that none of the changes made by this revision result in a decrease of the effectiveness of the plan and therefore are forwarded for your information and use.
The Security Plan and Attachment A are considered proprietary information and'shall be withheld from public disclosure pursuant to 10 CFR 2.790.
Please insure that the Security Plan Revision Transmittal Form is completed and returned to us as required by Section 13.8 of this plan.
We have not' received these foras for Revision 1 to copies 3,'3b, 3c, and 3d'of the plan which were sent to'you on or about July 30, 1980.
Your action on this matter wouldgbe appreciated.
g30Wd3c, i
' 5
. 2W.
~~
~
6G h ~ YN' !,\\
s 8102189310 i-Y
)# '*
,a e
f % ! hh R0liOCtM*M
_2-We trust this information is adequate.
If you have any questions, please contact Mr. William F. Conway, Vice President and Manager of Operations, at our West Brattleboro, VT offices.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION j
d Robert L. Smith Licensing Engineer WTP/caf
Enclosures:
- 1) Attachment A
- 2) Revision 2 to Vermont Yankee Physical Security Plan
-