Person / Time
Site: Fort Saint Vrain 
Issue date: 01/29/1981
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19345F443 List:
References
P-81029, NUDOCS 8102170500
Download: ML19345F442 (3)


LER-1980-078, Forwards LER 80-078/03L-0
Event date:
Report date:
2671980078R00 - NRC Website

text

i

~'

]

pubHe SeMee Company cf OrHende i

16805 ROAD 19%

_)

PLATTEVILLE, COLOR ADO 80651 January 29, 1981 Fort St. Vrain Unit No. 1 P-81029 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Mr. Seyfrit:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/

80-078, Final, submitted per the requirements of Technical Specification AC 7. 5. 2(b)3.

Also, please find enclosed one copy of the Licensee Event Report for

-Reportable Occurrence Report No. 50-267/80-078.

Very truly yours, Don Warembourg Manager, Nuclear Production DW/cis col Enclosure ec: Director, MIPC II g 10 2170500-S

REPORT DATE:

Januarv 29, 1981 REPORTABLE OCCURRENCE 80-078 ISSLT 0 CCCURRENCE DATE:

ce cemb e+- 30, 1980 Page 1 of 2 FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 19 1/2 PLATTEVILLE, COLORADO 80651 REPORT No. 50-267/80-078/03-L-0 Final IDENTIFICATION OF OCCURRENCE:

During an internal audit, it was discovered that one Surveillance Test had not been completed within the required interval. This is reportable per Fort S t.

Vrain Technical Specification AC 7.5.2(b)3.

EVENT

DESCRIPTION

During an internal audit of surveillances in December, 1980, it was discovered that SR 5.7.2b-A, the annual calibration and test of the fuel storage facility cooling system indicators and flow and temperature alarms, which was to be performed in November,1980, had not been completed since August 28, 1979.

There was spent fuel in storage at the time, but the surveillance was not issued due to the incorrect assumption that all spent fuel had been shipped off site.

CAUSE

DESCRIPTION:

The Results Engineering Supervisor incorrectly assumed all the spent fuel blocks had been shipped of f site and informed the Surveillance Clerk not to issue the Surveillance Test as scheduled.

CORRECTIVE ACTION:

The surveillance was issued and completed on December 24, 1980.

Test results disclosed no problems with the fuel storage facility cooling system.

No further corrective action is anticipated or required.

N-

REPORTABLE OCCURRENCE 80-078 ISSUE O Page 2 of 2 Prepared By:

11d, Asa 3. Reed

/

Technical Services Te[ethnician

/

l l

',/'

Reviewed By:

s.

J. W.,Gahm

~

Technical Services Supervisor

' / l 'l

' ~f Reviewed By:

Frank M. Mathie Operations Manager Approved By:

7w Don Warembourg

[

Manager, Nuclear Production l