ML19345F310

From kanterella
Jump to navigation Jump to search
Forwards Amend 1 to Agreement 1149-79-07 Cisp DC Between Nrc,Euratom & Federal Minister for Research & Technology of Federal Republic of Germany
ML19345F310
Person / Time
Issue date: 12/18/1980
From: Lafleur J
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To: Rovine A
STATE, DEPT. OF
Shared Package
ML19345F307 List:
References
NUDOCS 8102170168
Download: ML19345F310 (3)


Text

.'

~

~

O DEC 181980 Mr. Arthur 4. Rovine Assistant Legal Advisor for Treaty Affairs Departnent of State Nashington, D. C. 20520

Dear Mr. Rovine:

Enclosed is the certified copy of the Amend:nent fio. I to the Agreement No. 1149 07 CISP DC between BffT, NRC, and EURAT0ti.

Sincerely, t trfginal signed bg fosaph D. Iauetar, Je;,

Joseph D. Lafleur, Jr.

Deouty Director Office of International Programs

Enclosure:

Amendment No. I to the Agreemt.nt No. 1149 - 79 07 CISP DC Betwden The Bundesminister fur Forschung und Technologie der Bundesreoublik Deutschland (B C ) and the United States Nuclear Regulatory Commission (NRC) and the European Atomic Energy Community (EURATOM) bec w/ encl:

JDLafleur E. Shomaker, ELD ASpano, RES HFaulkner FILE 8.102779/47

,l 0

2

%y

... =.

3 "'">

.HFAULKNER :esz.

FLEUR

.I

=m, Z 12/16/,8n:

12/

./sn

.=

..u.=. m.=.

c c r

~

AMENDMENT N* 1 TO THE AGP2EMENT N* 1149 07 CISP DC BETWEEN

-=9 THE BUNDESMINISTER PUR FORSCHUNG UND TECHNOLOGIE

,[

_7 DER BUNDESREPUBLII DEUTSCHLAND (EFST)

.c AND THE UNITED STATES NUCLEAR PEGULATORY COMMISSION (NCR)/

AND THE EUROPEAN ATCMIC ENERGY COMMUNITY (EUPaTOM)

I l

WE2EAS This Amendment N* 1 extends the duration of the contract.

\\

The Bundesminister fuer Forschung und Technologie der Bundes-repuolik Deutschland (BMFT), represented for the purpose of signing this contract by Mr. SEIPEL, Bonn.

The United States Nuclear Regulatory Commission (NRC), repre-sented for the purpose of signing this contract by Mr. L.V.

GCSSICI, USNRC, Washington.

The European Atomic Energy Community (EURATOM), hereinafter referred to as "the Cennunity", represented by the Commission of the European ComnunitiEs, hereinafter referred to as a the Cornission", repre ented for the purpose of signing this con-tract by Mr. R.G. MAS,, Deputy Director General of the Joint Research Centre (JEC).

EA'!E A32EED AS FOLLOWS:

_2_

AMEND:GNT No 1 TO THE AGPIEIGNT No 1149-79-07 C ISP DC

1. Paracraph 5 of Annex 1 (TIIG SCHEDULE) is replaced as folloss:

Initiation of the experiments

January 1980 Termination of the experiments
October 1980
1...

Analysis of the results completed by

31. December 1980 i

A first review of the test matrix is foressen after 1d experi- _

ments. For this purpose a meeting vill be called by Js.C.

a

2. All other provisions of the contract remain unchanged.

'r

,.~ b.

ii Done at Ispra,, Wgtj_

in three originals in the English Language CEn A v [6.

k-O Fee The Bundesminist r The United States For the Commissiori (JRC)

Effr Fcrschung und Nucl. ear Regulatory Technologie der Commission (NRC)

R.G. MAS

.u Bundesrepublik Deputy Director General

  • Deutschland (BMFT) 2 9

-y-

%