ML19345F266

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1981
ML19345F266
Person / Time
Site: Rancho Seco
Issue date: 02/05/1981
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19345F267 List:
References
RJR-81-110, NUDOCS 8102170075
Download: ML19345F266 (2)


Text

'

.s

(.R * ' [1 D ~ ~ ^

Lsc. *.

> *,)

i SACRAYLNTO f.1U!1'C; PAL UTILil ? C: STRICT C 6201 S Strect, t>:v 1$530, Sacramentn, Cahfornia 558:3, (916) 452 3211 iUR 81-110 February 5, 1981 Director Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Cec: mission Washington, D.C.

20555 Re: Operating Plant Status Report Daar Sir:

Enclosed is the January Operating Plant Status Report for Rancho Seco Unit Onc.

' spa t ully submitted, l

R. J.

drig l

Manage Nuclear Operatio'ns RJR:RLil:rm l

cs: Office of Inspection &

Enforcement (9)

Rec <nn v O

jfoo%

5

//

i I

ta -(tcr.icnsrtu.tciuc ust inn u.1 e e.. o in tot ntui or c r r e :, r n i,

810217007$

j 4

4 Narrative Summary of Plant Operations 1-1 to 1- 0 Continuous operatir.s at 10it power. Performed routine surveillance and preventive mai-tenance.

J 1-31 0001 Began normal shutdown at 10 MW/ min.

6 i

0115 Reactor at 14% power. Opened OCEs.

0234 Eeactor 10-9 amps.

4 l

1025 Commenced RCS cooldown.

h 2337 Reactor in cold shutdown.

I

)

Major Items of Safety-Related Maintenance i

1 1.

Repaired and tested pressurizer safety relief valve.

j 2.

Calibrated and tested square root extractor in RPS Channel "D".

Personn7} Chances Reauiring Reporting j

Mr. John V. McColligan, forcer Supervisor of Engineering and Quality Control, has been replaced.by Mr. Daniel D. Whitney.

Mr. Whitney holds a BSME from Oregon State University and an MSNE from Stanford.

j

+

i In addition, he is a registered P.E. (techanical and nuclear) in i

the state of California.

i i

f Summary of Changes Made in Accordance with 10 CFR 50.59(b)

No changes in accordance with 10 CFR 50.59(b) were made during the month of January, 1981.

Cycle 4 Power Distribution Comparison In the District's letter to Mr. Robert W. Reid, dated Februe'

?7, 1980, Rancho Seco committed to perform Power-Distributf or. Co.

-isons through Cycle 4 as a result of_this being the first reload cota

(

utilizing Lucped Burnable Poisons.

1 OnJanuary1,1981,powerdistributiondatawasobtained'with[the core at 100 per cent power and 200.3 EFFD.'

From this data the BMS value of 0.024 was determined. This is well within the acceptance criteria established as.< 0.0731 l

l 1

i i

l