If<A r
b E,
II Ey ARKANSAS POWER & LIGHT COMPANY
~~
POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 January 29, 1981 1-011-27 2-011-27 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement Region IV U. S. Nuclear Regulatory Com'nission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
SUBJECT:
Arkansas Nuclear One - Units 1 & 2 Cocket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 NPDES Report (Files: 0900,0485,2-0900,2-0485)
Gentlemen:
In accordance with Environmental Technical Specification 5.4, attached is the Fourth Quarter of 1980 National Pollutant Discharge Elimination System Report for NPDES Permit No. AR0001392.
Very truly yours, bA.74 David.C. Trimble Manager, Licensing DCT:GAC:1p e3 Attachment cc: Director of Nuclear Reactor Regulation ATTN: Mr. R. W. Reid, Chief Operating Reactors Branch #4 po7 Division of Licensing (i
U. S. Nuclear Regulatory Commission 3
Washington, D.C.
20555 Director of Nuclear Reactor Regulation /
/ !
/)
ATTN: Mr. Robert A. Clark, Chief
($
Operating Reactors Branch #3 Division of Licensing U. S. Nuclear Regulatory Commission 810 200 o 47V-wasM ngton, D.C. vMmeas scum urnaies sysreu
L
.,.~h
[=/
A Y
y, s
b)
ARKANSAS PCWER & UGHT CCMPANY PCST CFCE SCX 551 UTTLE ROCK t AWSAS 72:03 $311371-4000 January 28, 1981 D10rnen'd,
\\
cuw d J AN 291931 C7-1404 jayAGS POWG & UGHT CO.
~
Mrs. Adlene Harrison EH S E b Regional Ad.~inistrator U.S. Enviren= ental Protecticn Agency Regicn VI First Internaticnal Building 1201 E?.= Street callas, Inxas 75270
Subject:
Arkansas Nuclear One Generating Facility NPCES Nurter AR0001392 Cear Mrs. Harrisen:
Enclosed is the Fourth Cuarter, 1980, National Pollutant Discharge Elimination System Monitoring Report for NPDES Pernit Nu-ler AR0001392, Arkansas Power and Light Cenpany's Arkansas Nuclear Cne Generating Facility.
Very truly yours, e
/-.s a
Cale L. Swindle, Ph.D Manager, Technical Analysis DLS/ST/ew Enclosure cc:
Mr. Jarrell Southall, Director Arkansas Depart =ent of Pollutien Control and Ecciogy
N W* '/%t.,
',R
?
?
A f
Sihn U
{
ARKANSAS POWER & LIGHT COMPANY POST CFF6CE BOX 551 UTTLE AOCK. ARKANSAS 722C3 (5011371 :422 e
WILUAM CAVANAUGH lil Nove.Tber 6,1980 t
v ce d :es.eert l
Geaceat. < S Cystruct.cn
=
i w r ~ ds ] C Di w
s u.-
.m v..m
' "-I 3E NOV.- 71980 s
l-15. Adlene Harrison AR(ANSAS r0?ig;t a llGHT CO-Regien31 Administrator
'?
U. S. Environmental Protection Agency
MANSAS fluctgja gn'e Pagion VI First International Building 1201 Elm Street Dallas, Texas 75270 O
REFEP.Ei;CE : Arkansas !!uclear Cne SES
~'
itPDES Permit !!c. AR0001392 O
Dear !:
- s. Harrison:
This letter represents a noncompliance report as required by Part !!,
Paragraph A.2 of the above referenced Permit.
On Thursday October 30, 1980, routine sacpling at sample pein3_.002, sanitary sewage effluents, resulted in a pH determination of(5 y.
Per-5 mit ':mits are 6.0 - 9.0 standard units.
Investigation of tnis viola-ti,n has recae*.ed that the Sewage Treatment Plant (STP) had undergone a miner system upset.
The probable cause of this upset is the cen-struction activities underway to expand the facility which will give us a greatly increased capability under normr.1 conditions.
This expansion has been necessitated by a lluclear Regul; story Ccemission requirement to construct an Emergency Response Center.
Sanitary waste frcm this ccm-plex is to be routed to the existing but expanded sewage treatment plant.
This phase of construction on the STP facility involves electrical hook-up and earth work.
It is suspected that influent wastewater was shut off inadvertently during the electrical work. With no flow through the facility and continued operation cf the air pumps on the facility, a j
processing alteration occurred.
.~
D**D
- D 3I l
o o J' oJ Jlt.1 o
t
.s - a n.
3 s s.
c u t
CL-1314 Ms. Adlene Harrison Novetber 6,1950 These constructicn activities should end by mid-November,1980.
In the creanwhile, surveillance on the STP will be increased frca four to six daily ins;cc.cns in an effort to restore its norral chwn in spue -
af u.e cc. Tit 7ertion-activities in the area.
Very truly yours,
/
I VJ..
. = = ~
t t/4 %
- W N
~
William Cavan 111
/
WC/EG/ew cc: Messrs.
J. L. Maulden C. L. Steel D. P. Moran W. G. Coleman 3
Dr. D. L. Swindle O. A. Rueter J. D. Jackscn J. M. Griffin O
J. P. O'Hanlon /
J. Southall, Director Arkansas Department of Pollution Control and Ecolo9y 9
9 t
1 l
6 l