Comments on NUREG-0660 Re TMI Action Plan Requirements. Development of plant-specific Simulator for Facility Is Not Economically Feasible & Could Not Be Developed by 811001. Requests Exemption from Simulator Training Requirements
ML19345F088
Person / Time
Site: Fort Saint Vrain 
Issue date: 12/31/1980
From: Walker R
PUBLIC SERVICE CO. OF COLORADO
To: Ahearne J
NRC COMMISSION (OCM)
References
FRN-45FR50613, RTR-NUREG-0660, RTR-NUREG-660, TASK-1.A.4.1, TASK-TM 45FR50613-5, P-80443, NUDOCS 8102060691
Download: ML19345F088 (2)


Text

...

[

/

___._- [ T yj public Service Company 2 OcdomfIo n

s -

..i 5

December 31, 1980 i sr - "

Fort St. Vrai-t-

C Unit No.1 hc) xx:sII apahBER,-)R.,wjo w[.agec 443. et. P-80443

/e x4, paae suu vrFA. cow s 24's

%v d

e-f D8/

QF rg Dr. John F. Ahearne, Chairman 5

' ' r,h g 4

U. S. Nuclear Regulatory Commission g '%f Washington, D.C.

20555 4

SUBJECT:

TMI Action Plan Requireme.

Dear Dr. Ahearne:

As you are no doubt aware, we, along with many other utilities, have been struggling to meet the many post-TMI requirements with the struggic being complicated by a myriad of requirements, complicated further by the fact that many of these requirements have been subject to changes in criterion. Having the only HTGR in the country, our problems have ceen compounded by trying to interpret requirements issued on the basis of water reactor technology and trying to apply these requirements to gas cooled technology.

We continue to experience considerable difficulty in our approach to the various requirements in that most of the TMI review teams are unfamiliar with the HTGR concept.

continuing our efforts, but we have recently experienced one We are problem that is of extreme concern.

Item I.A.3.1 of NUREG 0737 includes a requirement for the use of simulators, by October 1,1981, in the operator training program. On December 10, 1980, we met with members of the NRR staff (Special Projects Division and OLB) to discuss this requirement as it pertains to Fort St. Vra.in..

pm,<.

m y

p.

Our position is as follows:

. i ','...

1.

Fort St.

Vrain is a one-of-a-kind reactor and there are no simulators, either generic or plant specific that are l

available for use in our operator training program.

2.

Use of any existing simulators developed for LWR technology l

would be of little value in our operator training program.

g y

3.

Development of a plant specific simulator for Fort St.

tle f

[,/ Y, is not economically feasible and even if it were f 81'.pk ff -h,,;

such a simulator could not be developed by October 1 y requirements on aS not even remotely similan( jmabg 6ISS* w Inpos' tion of simulator training u n i g t.-

reactor, that is se g other reactor, appears to be an unreasonable requiremag,nyDg f

i i

\\;/ y ; &

C-

\\

l m o m u.../. 2 X oW d

3r 8102 0 s o69;

T-D g-y.

Y 4

Although operator training in terms of appropriate operator F

action in mitigating the con <equences of accidents is important, it should be noted that the HTGR is more forgiving in terms of time required for immediate operator y

3 action.

We feel that our ocerators could receive adequate i

training without the use of simulators.

S i

5.

Recognizing the intent of simulator training we are prepared to upgrade our operator training program to concentrate more i

heavily on transient response and hands-on experience as a substitute for simulator training.

We were informed by the NRR staff at the December 10, 1950, meeting that the requirement for simulator training was presently being placed in a proposed regulation and would be issued for comment as a proposed change to ICCFR50.55.

We recognize that we will be given the opportunity to comment on the proposed revision to 10CFR50.55, but we also recogni:e that it is much more difficult to get a proposed ruling change made after it is issued than perhaps it might be to obtain consideration prior to its issuance.

On :nis basis we are appealing to the Commission that appropriate consideration be given to Fort St. Vrain prior to the issuance of the proposed regulation. Your consideration in exempting Fort St. Vrain from the simulator training requirements is greatly aporeciated.

If you should have any questions or require any additional information, please contact Mr. Don Warembourg, Manager of Nuclear Production, (303) 571-7436.

(

Sincerely yours, j

R v. uJ ca.d#

l R. F. Walker President l

RFW/alk i