ML19345F062
| ML19345F062 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 11/24/1980 |
| From: | Cohen I, Joyner J, Roxanne Summers, Woltner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19345F047 | List: |
| References | |
| 70-0820-80-20, 70-820-80-20, NUDOCS 8102060604 | |
| Download: ML19345F062 (1) | |
Text
.
~
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I l
Report No.
70-820/80-20 Docket No.70-820 License No.
SNM-777 Safeguards Group 1
Licensee:
United Nuclear Corporation Wood River Junction. Rhode Island 02894 Facility Name:
United Nuclear Corporation Recovery Systems Inspection At:
Wood River Junction, Rhode Island Inspection Conducted:
October 21-24, 1980 Date of Last Material Control and Accounting Inspection:
October 9, 1980 Type of Inspection: Unamnounced Material Control and Accounting 1/!/3f80 Inspectors: o
/date I. Cohen, Chymist
$h Athf
// f }D E. Woltner, Auditor
' date
- 7. Em n /,r /so R. Summers, Auditor date Approved by:
",19 4ka/
l//7.$/[Ps Jojner, Qi,ef,fNuclear Material Control idate Support CGctiM, Safeguards Branch Inspection Summary:
Areas Inspected:
Decommissioning Activities.
The inspection involved 84 inspector-hours onsite by three NRC inspectors and was begun during the regular hours.
Results : The licensee was found to be in compliance with NRC requirements in the areas inspected except for the following item: A revision to the Fundamental Nuclear Material Control Plan was not submitted by the deadline imposed by NMSS.
Region I Form 166 (August 1979) m o2osobow