ML19345F062

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0820/80-20 on 801021-24.Noncompliance Noted: Revision to Fundamental Nuclear Matl Control Plan Not Submitted by NMSS Deadline.Details Withheld (Ref 10CFR2.790)
ML19345F062
Person / Time
Site: Wood River Junction
Issue date: 11/24/1980
From: Cohen I, Joyner J, Roxanne Summers, Woltner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19345F047 List:
References
70-0820-80-20, 70-820-80-20, NUDOCS 8102060604
Download: ML19345F062 (1)


Text

.

~

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I l

Report No.

70-820/80-20 Docket No.70-820 License No.

SNM-777 Safeguards Group 1

Licensee:

United Nuclear Corporation Wood River Junction. Rhode Island 02894 Facility Name:

United Nuclear Corporation Recovery Systems Inspection At:

Wood River Junction, Rhode Island Inspection Conducted:

October 21-24, 1980 Date of Last Material Control and Accounting Inspection:

October 9, 1980 Type of Inspection: Unamnounced Material Control and Accounting 1/!/3f80 Inspectors: o

/date I. Cohen, Chymist

$h Athf

// f }D E. Woltner, Auditor

' date

7. Em n /,r /so R. Summers, Auditor date Approved by:

",19 4ka/

l//7.$/[Ps Jojner, Qi,ef,fNuclear Material Control idate Support CGctiM, Safeguards Branch Inspection Summary:

Areas Inspected:

Decommissioning Activities.

The inspection involved 84 inspector-hours onsite by three NRC inspectors and was begun during the regular hours.

Results : The licensee was found to be in compliance with NRC requirements in the areas inspected except for the following item: A revision to the Fundamental Nuclear Material Control Plan was not submitted by the deadline imposed by NMSS.

Region I Form 166 (August 1979) m o2osobow