Submits Final Response to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Vendors Have Indicated That Specified Switches Are Not Being Used at Facility
ML19345E836
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 12/23/1980
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-20, NUDOCS 8102060239
Download: ML19345E836 (2)


Text

"_ - *

% :3h IN Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430 4316 Via Pradet Engeneering and Construction December 23, 1980 Mr. Boyce H. Grier, Director e Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 9 Region 1 kk\ k) h'NT 631 Park Avenue S U King of Prussia, Pennsylvania 19406 _: ,- gfS$1YD C_, -

Dear Mr. Grier:

k ,

NRC IE BULLETIN NO. 80-20 q[ @

FAILURES OF WESTINGHOUSE TYPE W-2 g ,

SPRING RETURN TO NEUTRAL CONTROL SWITCHES NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION In reply to IE Bulletin No. 80-20 dated July 31, 1980, we offer the following at this time:

On September 3, 1980 and November 14, 1980, we supplied interim reports to the NRC indicating that the investigation being conducted by Bechtel Power Corporation, our Architect Engineer, was continuing. It was reported that Dechtel was surveying its suppliers to determine use of the subject switches.

Bechtel has received answers from all vendors except the "Q" l

HVAC vendor that Westinghouse Type W-2 control switches with spring return to neutral position are not being used or planned for use at the Hope Creek Generating Station. To date, none of the "Q" HVAC panels have been approved and they will not be approved by PSE&G if they contain the Westinghouse W-2 switch.

410206bSMc1 -

i

. - r l

Boyce H. Grier 12/23/80 i

Should any additional information be desired, we will be i

pleased to further discuss it with you.

Very truly yours, j

i CC Office of Inspection & Enforcement 4 Div. of Reactor Operations Inspection Washington, DC 4

.t 4

5 i

i ,-

_ . . . _ . . . - - , . . . . . , , _ . . . . - . _ , , _ . , . . . . - - . . _ . . . . , - _ - . . . . - _ _ _ . ., , - . - _ , ,