Responds to IE Bulletin 80-21.Formal Determination of Affected Valves Has Been Initiated But Complete Response May Take 1 Yr or More.Insp Results Affected Valve Manufacturers & Planned Action Schedule Will Be Submitted Prior to 811101
ML19345E543
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/01/1980
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
A01342, IEB-80-21, NUDOCS 8102050096
Download: ML19345E543 (2)


Text

,.

@v NORTHI!AST trrII.frII!S l

UIN[ EtYc*lE7 P O. BOX 270 HARTFORD. CONNECTICUT 06101 wet man.v"na: =< c:,

{

6 a f uf 1

(##48ef er W w sit s/t I an i est.qv (ftspasse

?

~~

(n Y

December 1, 1980 Docket Nos. 50-213 50-245

~

50-336 E

A01342 Mr. Boyce H. Grier, Director Region 1 Of f fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

References:

(1)

B. H. Grier letter to W. G. Counsil (CYAPCO) dai.ed November 6,1980 transmitting I&E Bulletin No. 80-21, (Docket No. 50-213).

(2)

B. H. Grier letter to W. G. Counsil (NNECO) dated November 6,1980 transmitting ISE Bulletin No. 80-21, (Docket Nos. 50-245, 50-336, 50-423).

Gentlemen:

Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos.1 and 2 Response to I&E Bulletin No. 80-21 In reference (1) and (2), Connecticut Yankee Atomic Power Company (CYAPCO) and Northeast Nuclear Energy Company (NNECO), respectively, were requested to take appropriate action in response to I&E Bulletin No. 80-21.

CYAPCO and NNECO have formally initiated the determination of the affected valves (I&E Bulletin No. 80-21, action item (1)) in their respective plants by contacting suppliers of active valves in safety related systems.

CV '.PCO and NNECO have also indicated by telephone to the NRC that a complete response to the Bulletin may well require an effort of a year Once the responses from the valve suppliers are received, a or more.

schedule will be established for an orderly inspection program; until that time it is not possible to accurately estimate a completion date for either CYAPCO's or NNECO's ef forts. The staff should be aware that visual inspection of the valves is not necessarily a simple task.

As an example of one significant complicating factor, many of the valves may be covered with insulation which must be removed.

tl0 aG O%

9

--a----------.A

. It is anticipated that the response to these letters to suppliers and the subsequent determination of affected valves will be available oy March 6, 1981.

CYAPCO and NNECO intend to advise the staff of the initial determinations (Bulletin item (1)) and the inspection schedules for Haddam Neck and Millstone Units 1 and 2, respectively, prior to June 1, 1981.

Inspection results (item (2)), affected valve manufacturers, planned action (item (3)), and the schedule for accomplishing this action for accessible valves shall be submitted to the NRC prior to November 1, 1981. The same information on the inaccessible valves shall be submitted to the NRC prior to startup following the next scheduled refueling for each of the three ope ating plants.

In the interim, please be assured that both CYAPCO and NNECO recognize the staff's concerns on this issue and are responding pecordingly.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

}

W. G. Counsil Senior Vice President A