ML19345E351
| ML19345E351 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/04/1980 |
| From: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19345E350 | List: |
| References | |
| NUDOCS 8101130174 | |
| Download: ML19345E351 (1) | |
Text
.
f NM
, o so,,,,
i wieoao cowci. cut ceiei em, em een A
L J ! * ~; '. '".'..'."." 1.
Me rc h k, 1960 Doc ket U s. $0-2 L ';
$0 _i36 Darrell G. Ridenhut, Acting Director Division of Operating Reactors Office of Buclear Reactor Regulation U. S. haelear Regulatory C<mmission 1dsahington, D. C.
20555
References:
(1)
D. O. Eisenhut letter to All Power Reactor Licenseec dated October 10, 1979 (2)
W. G. Counsil letter to D. G. E;senhut dated December 26, 1979 Gentlemen:
Millstone Buelear Power Station, Unit hos. I and 2 Site hiergersey Plan la Reference (1), Northeast Buclear Energy Company (NNECO) was requested to prepare and sulunit an upgraded site emergency plan for Millstone Nuclear Power Station, Unit Boe. I and 2.
This request was fulfilled by Reference (2).
Since sunmittal of Reference (2), an error has been identified which should be correctoi in your copies of the Energency Plan.
In Arpendia B Figure 3a is incorrectly titled " Dose Rate Outside Equi; cent Esteh*. The correct title for this Figure is " Dose Rate Outside Personnel Air Iock". A corrected copy is attached.
Em regrets any inconvenience this error r.y have caused.
Very truly yours.
NORTHEAST NUCLEAR ENER0Y COMPANY
/Y: JLA W. G. Counsil Vice President Attacheent
.