s-m gh_v g l.c/L YANKEE ATOMIC ELECTRIC COMPANY 4
441 STUART STREET. BOSTON 16 MASSACHUSETTS o
-!v/
.- [ h February 10, 1961
((
[
Y
.\\
f8 l:l)3 W J. S. A toric h rgy Comissica 7- [ q ','
jf
\\
O ;
\\-
i Washi.ngton 2'f, 1.
C.
>p y
'c f.
- +
m
'"ft, f$
/ [,
A tte ntion :
hvision of 1.icensing ard Regulation x'
lW/y.
s 3
\\ \\P
\\
Icar Sirs:
a;i4 AMENL.$.NT NO. 2L f0 LICENSE APPLICATION LA T/E JUNE 2?, 1956 (DONT}:0.$0-29),
1.
Nrcuant to the Atorde E.lergy Act cf 195L and the Comnis sien 's Mies anc Regulatiens issued thereunder, Yankee At,cnic Electric Company desirec te supplevnt ar.d amnd its license appilcation dated June 27, 1956
'ty supplying to infornatien set fortn on the following acditional cr supersMir.g pages, unich ehould be innerted as follows:
Superseded pages dated 9/1$/5) to New pages datea 2/10/61 Part B -
be rer.oved from to be inserted in
,.(j rechnical Information current application current applicatien 232 PJJ IATION mIELLING 232:3 232: 3 232:h 2.
Ate foregoing informc. tion revises the license applicatien to re flec t the following change:
Surplemntal shielding rcterial has been installed adjacent to the roacter veseel head.
Sis shielding is in addition to shielding described in Section 232 of the license anplication entitled "Radisticn Shielding".
The shielcing described thereit, was installed during the construction of the plant and has not been r.odified in anf way.
The desirability of additional chielding was established during i rforr.ance of Irltial Wclear Plant Power Cieratio:tel Test 503Fh the o
entitled " Biological Shield Effcetiveness Test" as described in the license application and referenced in the Technical Specificaticns.
Radiation surveys trade at plant leads of 17, 30 and 60 L' gross electric revealed higher than anticipated neutron levels throughout the si te. Althougn the radiation levels reasured at these loads were less than the criteria set up as a basis for design in the licenss application of 0.7f nr per hour at working stations and 2 mr por hour I
D466678
1 i
U. S. Atomic Energy Comission February 10, 1961 Division of Licensing and Regulation r.ge 2 i
O l
for intermittently manred ground level areas, which in turn are less than allowable levels established in 10 CTR 20, the ressured values j
did indicate that radiation levels at higher reactor power levels
]
would probably exceed established levels.
The source of these higher than expected radiation levels as determined to be neutron streaming upward through an annular space
{
between the reacter vessel and the water filled neutron shield tank.
These neutrons were then apparently scattered by various structures l
within the steel sphere, by the sphere itself and by the atmosphere so as to pmvide a diffused but appreciable level thmughout the l
site.
Before the reactor load was increased above 60 W gross electric, tenporary shielding was installed around the reactor head in the fern of two layers o f water-filled barrels.
These barrels reduced the neutron levels previously masured at working stations by a_ factor of
]
approximately six.
The levels measured at 90 W were well within the i
established limits.
Based on measurements taken with the temporary I
shielding in place, the pemanent supplemsntal chielding was desi ned E
and installed as described in the accompanyinF amendment.
lhis installation further reduced the masured levels so that the overall reduction factor ranged fmm 10 to 18 All working areas and all intermittently manned ground level armas are well within established levels at the present plant load cf 120 MW gross electric.
The i
supplemental shielding is designed and has proven to be sufficiently effec +,ive so that operation at increased plant loads will not increase radiation levels above the established limits.
In Yankee's cpinion the foregoing change is not prohibited by the terms of License No. DPR-3 or the technical specifications attached theret45 i
does not require prior authorization by the Consdasion pursuant to para-i graphs 3. A and 3.D of the license since no change in the technical i
specifications is involved, either directly or by reason of a change or i
modification of information in the license application which is 'incorpor-l ated by reference in the technical specifications; and involves no hasards j
not heretofore described in or implicit in the license application.
i Accontingly, this anendment is filed solely for the purpose of bringing '
up to data the technical information supplied as a part of the license application.
I Bespectfully submitted, i
YANKEE A':0MIC EIECTRIC COMPANY l
t Rogp] J. C VicW President t
O.
3 a
O C.
A *zrti c Em ra Conrit e sion February 10, 1961 Division of Licensirt and Regulation lige 3 i
l Ccmonwealth of Massachaetts Suffolk, es.
?ebruary 10, 1961 i
Then personally ar;eamd before rm Ror,er J. Coe, who, being duly sworn, dici s t a te t '.a t he is a 7 ice President cf Yankee Atode Electric Company, the applicant herein, that he is duly authorized to execute and file th e foregoing srv. nd. vent in the rue and on behalf of Yankee AtcMe Coctric Cer pany, and that the statements in said amendmnt are true to the best of his kncvitsdge ami telief, hueAN ML~
DONALD G. ALLEN, f.Dit ? FilDUC My Cathresxq Dpae: Jn 21. ISC/.
O i
I l
l l
I l
I i