05000338/LER-1980-101-03, /03L-0:on 801207 While Operating in Mode 1 at 70% Power,Containment Hihi Pressure Alarm Channel 2 Was Received.Caused by Signal Comparator Card Failing Low Out of Tolerance.New Card Installed

From kanterella
(Redirected from ML19345E192)
Jump to navigation Jump to search
/03L-0:on 801207 While Operating in Mode 1 at 70% Power,Containment Hihi Pressure Alarm Channel 2 Was Received.Caused by Signal Comparator Card Failing Low Out of Tolerance.New Card Installed
ML19345E192
Person / Time
Site: North Anna 
Issue date: 12/17/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19345E190 List:
References
LER-80-101-03L, LER-80-101-3L, NUDOCS 8012230428
Download: ML19345E192 (1)


LER-1980-101, /03L-0:on 801207 While Operating in Mode 1 at 70% Power,Containment Hihi Pressure Alarm Channel 2 Was Received.Caused by Signal Comparator Card Failing Low Out of Tolerance.New Card Installed
Event date:
Report date:
3381980101R03 - NRC Website

text

.

LICENSEE EVENT REPORT C0hTROL BLOCK / / / / / / / (1)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

/0/1/

/V/A/N/A/S/1/ (2)

/0/0/-/0/0/0/0/0/-/0/0/ (3)

/4/1/1/1/1 (4)

/ / / (5)

LICENSEE CODE LICENSE NUMBER LICENSE TYPE CAT

/L/ (6)

/0/5/0/0/0/3/3/8/

(7)

/1/2/0/7/8/0/ (8) /1/ 2/1/ 7/ 8/ 0/ (9)

E DOCKET NUMBER EVENT DATE REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES (10)

/0/2/

/

On December 7, 1980 while operating in Mode 1, at 70% power, the Containment

/

/0/3/

/

HiHi Pressure Alarm channel II was received. Since the operator verified

/

t

/0/4/

/

containment pressure was normal, and placed channel II in the trip mode within /

/0/5/

/

one hour, the health and safety of the public were not affected. The applic- /

/0/6/

/

able T.S. is 3.3.2.1 and the event is reportable pursuant to 6.9.1.9.a.

/

/0/7/

/

/

/0/8/

/

/

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMP 0NENT CODE SUBCODE SUBCODE [0[9[

/S/D/ (11)

LE/,(12) /G/ (13) /I/N/S/T/R/U/ (14) M/ (15) g/ (16)

E SEQUENTIAL OCCURRENCE REPORT REVISION LER/R0 EVENT YEAR REPORT NO.

CODE TYPE NO.

(17) REPORT NUMBER

/8/0/

/-/ /1/0/1/

/\\/

/0/3/

/-/

[0/

ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM SUB. SUPPLIER MANUFACTURER [E[ (18) /Z/ (19) /Z/ (20) /Z/ (21) /0/0/0/0/ (22) g/ (23) /N/ (24) [Nf( (25) /W/1/2/0/(26)

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

/1/0/

/

The cause of this event was a signal comparator card which failed low out of

/

/1/1/

/

tolerance. The corrective action was to install a new, properly calibrated

/

/1/2/

/

circuit card, and return channel II to service.

/

/1/3/

/

/

/1/4/

/

/

FACILITY METHOD OF STATUS

% POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION (32)

/1/5/

g[ (28)

/0/7/0/ (29) /

NA

/ (30) /A/ (31) / Operator Observation /

ACTIVITY CONTEhT RELEASED OF RELEASE AMOUNT OF ACTIVITY (35)

LOCATION OF RELEASE (36)

/1/6/

LZ[ (33)

LZ[ (34) /

NA

/

/

NA

/

PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION (39)

/1/7/ /0/0/0/ (37) [Z[ (38) /

NA

/

PERSONNEL INJURIES NUMBER DESCRIPTION (41)

/1/8/ /0/0/0/ (40) /

NA

/

LOSS OF OR DAMAGE TO FACILITY (43)

TYPE

DESCRIPTION

/1/9/

LZL (42) /

NA

/

PLTLICITY ISSUED DESCRIPTION (45)

NRC USE ONLY

/2/0/

[N/[ (44) /

NA

/////////////

NAME OF PREPARER W. R. CARTWRIGHT PHONE (703) 894-5151 8019g80 y") 3

Virginia Electric and Power Company North Anna Power Station, Unit 1 Attachment: Page 1 of I Docker No. 50-338 Report No. LER 80-101/03L-0

Description of Event

On December 7, 1980 while operating in Mode 1, at 70% power, the Containment HiHi Pressure Alarm was received.

Probable Consequences of Occurrence Since the operator verified containment pressure was normal, and placed channel II in the trip mode within one hour, the health and safety of the public were not affected.

Cause of Event

The cause of this event was a signal comcarator card which failed low out of tolerance.

Immediate Corrective Action

The immediate corrective action was to verify that containment pressure was normal, and place channel II in the trip mode.

Scheduled Corrective Action There are no scheduled corrective actions.

Actions Taken to Prevent Reccurrence A new, signal comparator card was installed properly calibrated, and channel II was returned to service.

Generic Implications There are no generic implications.