Notice of Issuance & Availability of Amend 21 to License NPF-4
ML19345E106
Person / Time
Site: North Anna 
Issue date: 11/19/1980
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19345E099 List:
References
NUDOCS 8012230139
Download: ML19345E106 (2)


Text

r h

7590-01 UNITED STATES NUCLEAR REGULATORY C09'ISSION DOCKET NO.50-33S VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued 5

i Amendmnt No. 21 to Facility Operating Li.ense No. NPF-4 issued to the Virginia Electric and Power Company (the licensee) for operation of the North Anna Power Station, Unit No.1 (the facility) located in Louisa Cou,nty, Virginia.

The amendment is effective as of its date of issuance and is to be implemented as soon as practicable but not later than June 30, 1982.

l The enendment revises a license condition to require.that certain Sarton Lot 1 Transmitters inside containment 'be modified or replaced as soon as practicable but not later then June.30.,1982.

The application for the amendment complies with the standards and requirements of the Atomic' Energy Act of 1954, as amended (the Act),

l l

and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules.

and regulations in 10-CFR' Chapter I, which'are set forth in the license amendment.. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration..

~

.m

.m 7590-01 9

i The Commission has determined that the issuance of this amendment

.:ill not resielt in any significant environmental impact and that pursuant-

{

to 10 CFR cention 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.

For further details with respect to'this action see (1) Virginia Electric and Power Company letter dated July 22,1980;-(2) Amendment tio.'21 to Facility Operating License tio. NPF-4; and (3) the Commission's relatedL l

Safety Evaluation. These items are available for.public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, 4

D. C.

20555 and at the Board of Supervisor's_ Office, Louisa County l

Courthouse, L'ouisa, Virginia 23093 and at the Alderman Library, Manuscripts separtment, University of Virginia, Charlottesville, Virginia 22901.

'A

. copy of items (2) and (3) may be obtained up.on request to the U.'5. Nuclear-I Regulatory Commission, Washington,-D. C. 20555, Attentioni Director, 1

J Division of Licensing.

Dated at Bethesda, Maryland this 19th day of November 1980.

l FOR THE NUCLEAR REGULATORY COMMISSION Mh Robert A. Clark, Chief N

l Operating Reactors Branch #3

. Division-of Licensing j

.~

1 r