ML19345E079

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-23, Failure of Solenoid Valves Mfg by Valcor Engineering Corp. No Valcor Solenoid Valves W/Parts V70900-21-1 or V70900-21-3 Installed in safety-related Applications
ML19345E079
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/02/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-23, NUDOCS 8012230069
Download: ML19345E079 (1)


Text

-

f/D ew I

mam Wisconsin Electnc eowea couesur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI S3201 December 2, 1980 i

l Mr. James G. Keppler, Regional Director Office of Inspection and Enforcement Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NOS. 50-266 AND 50-301 REPLY TO IE BULLETIN 80-23 POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Your letter of November 14, 1980, forwarded IsBulletin 80-23, " Failure of Solenoid Valves Manufactured By.

I Valcor Engineering Corporation".

A review of solenoid valve application at Point Beach Nuclear Plant indicates that there are no Valcor solenoid 1

valves having part numbers.V70900-21-1 or V70900-21-3 installed

-in any sa'ety-related application.

f Very truly yours, t

/

fl'U/g'y O

h.

../

ss s

~

gg

_t 5

C. W.

Fay, Director r

.;g Nuclear Power Department.

il (

NY.

Copyho U.jS. NUCLEAR REGULATORY COMMISSION Office of. Inspection and Enforcement.

)qN Division of Reactor Operations Inspection Washington, D.,C..

20555

.NRC' Resident ~ Inspector Point Beach Nuclear Plant

.soissso Og E

aw

.