ML19345D840

From kanterella
Jump to navigation Jump to search
Forwards LER 80-010/03L-0
Date released: 12/25/2019 Download: ML19345D840


LER 80-010/03L-0:on 801117,safety Injection Pump 2P15A Motor & Pump Shaft to Coupling Keys Found to Be Sheared.Cause Undetermined.Pump & Motor Checked for Damage,Keys Replaced & Pump Operability Verified
ML19345D857
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/11/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19345D857 (2)
Forwards LER 80-010/03L-0
ML19345D839
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/11/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19345D839 (1)