ML19345D672
| ML19345D672 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/11/1980 |
| From: | Mayer L NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19345D673 | List: |
| References | |
| NUDOCS 8012160453 | |
| Download: ML19345D672 (1) | |
Text
.
MSP NORTHERN STATES POWER COMPANY wo~usano u s wi~~asora ss.oi December 11, 1980 Director, Office of Management Information & Program Control c/o Distribution Services Branch, DDC, ADM U S Nuclear Regulatory Coc: mission Washington, DC 20555
Dear Sir:
PRAIRIE ISLAND tiUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report November, 1980 Attached are two copies of the Monthly Operating Report for November, 1980 for the Prairie Island Nuclear Generating Plant.
Yours very truly, L 0 Mayer, PE Manager of Nuclear Support Services LOM/bd ec: Director, IE-III, USNRC (1)
Director, IE, USNRC (c/o DSB) (10)
NRC Resident Inspector MPCA Attn: J W Fe r.2an
.e g
r_ !
s\\
80121eo#3 4
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No. 1 DATE 801201 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-1121 MONTH
%v h.,.
1onn s
The unit was in Load Follow operation this :nonth. At 0928 S
on 11-11 an error in performing a safeguards logic test resulted in a spurious safety injection and unit trip. The unit was returned
?
to service at 1733 the same day.
m L
E s- ~ ~.,,
x
-~w,-
~non.r-
,e
, g v
~ -., -,
.-m-
-,e->
,r,-
r, w-,,
v eg eww g,-
s-