Monthly Operating Repts for Nov 1980
ML19345D647
Person / Time
Site: Dresden  
Issue date: 12/01/1980
From: Cieszkiewicz S
COMMONWEALTH EDISON CO.
To:
Shared Package
ML19345D646 List:
References
NUDOCS 8012160420
Download: ML19345D647 (15)


Text

.

OPERATING DATA REPORT DOCKET NO. 050-010 DATE December 1, 1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 i

OPERATING STATUS NOTES 1.

Unit Name:

Dresden I 2.

Reporting Period: November, 1980 3

Licensed Thermal Power (MWt): 7GO 4.

Nameplate Rating (Gross MWe): 209 5

Design Electrical Ratir.g (Net MWe): 200 6.

Maximum Dependable Capacity (Gross MWe): 205 7

Maximum cependable Capacity (Net MWe):

197 8.

If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

NA i

9 Power Lr<el to Which Restricted, if Any (Net MWe): NA 10.

Reasocs For Restrictions, if Any:

NA This Month Yr-to-Date Cumulatisa I

11.

Hours in Reporting Period 12.

Number of Hours Leactor Was Critical 13 Reactor Reserve Shutdown Hours

- V T

-- 7 14.

Hours Generator On-Line

[

2. A i Il J

~

15 Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH)

~

ATION 17 Gross Electrical Ecergy Generated (MWH)..

18.

Net Electrical Energi Generated (MWH) 19 Unit Service Factor l

20.

Unit Availability Factor O U__ A G _-

21.

Unit Capacity Factor (Usi1g MDC Net) 22.

Unit Capacity Factor (Usi.1g DER Net) 23 Unit Forced Outage Rate 24.

Shutdowns Scheduled Ove: Next 6 Months (Type, Date, and Duration of EachTl~

~

NA i

25 If Shut Down At Er d Of Report Period, Estimated Date of Startup: Extended Modification l

Outage - Shutdown Until June, 1986.

1 8012160 N

OPERATING DATA REPORT DOCKET NO. 050-237 DATE December 1,1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.

Unit Name: Dresden II 2.

Reoorting Period: November, 1980 3

Licensed Thermal Power (MWt):

4.

Nameplate Rating (Gross HWe):~~~~2527 828 5

Design Electrical Rating (Net MWe): 794 6.

Maximun Dependable Capacity (Gross MWe): 812 7

Maximum Dependable Capacity (Net Ne) : 772 8.

If Changes Occur in Capacit*,' Ratings (items 3 Through 7) Since Last Report, Give Reasons:

NA 9

Power Level to Which Restricted, if Any (Net MWe): NA 10.

Reasons For Restrictions, if Any:

NA This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 720 8,040 92,496 12.

Number of Hours Reactor Was Critical 691.37 7.741.38 72.477.82 13 Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 674.68 7.571.38 68.833.92 15 Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 868.020 14.933.906_

136.575.738 17 Gross Electrical Energy Generated (MWH) 263.069 4.649.397 _

43,656,016 18.

Net Electrical Energy Generated (MWH) 243.039.67 4.382.272.07 41.270.383.287 19 Unit Service Factor 94 94 74 20.

Unit Availability Factor 94 94 74 21.

Unit Capacity Factor (Using MDC Net) 44 71 58 22.

Unit Capacity Factor (Using DER Net) 41 69 56 23 Unit Forced Outage Rate 6

3 12 l

_24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueline. December 31, 1980. 17 weeks.

25 If Shut Down At End Of Report Period, Estimated Date of Sta: tup: NA l

l l

t

OPERATING DATA REPORT DOCKEi NO. 050-249 DATE December 1,1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.

Unit Name: Dresden III 2.

Reporting Period: November, 1980 3

Licensed Thermal Power (MWt): 2527 4.

Nameplate Rating (Gross MWe):

828 5

Design Electrical Rating (Net MWe): 794 6.

Maximum Dependable Capacity (Gross MWe): 812 7

Maximum Dependable capacity (Net MWe):

773 8.

If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:

NA 9

Power Level to Which Restricted, if Any (Net MWe): NA 10.

Reasons For Restrictions, if Any:

NA This Month Yr-to-Date Cumul.ative 11.

Hours in Reporting Period 720 8,040 82,081 12.

Number of Hours Reactor Was Critical 710.37 5,793.1 61,558.42 13 Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 706.17 5.691.68 59.016.22 15 Unit Reserve Shutdown Hours 0-12,837.692 115,109,359 0

0 16.

Gross Thermal Energy Generated (MWH) 1.677.311 17 Gross Electrical Energy Generated (MWH) 549,017 4,120,912 37,550,586.25 18.

Net Electrical Energy Generated (MWH) 522,414.33 3,903,453.93 35,596,744.89 19 Unit Service Factor 98 71 72 20.

Unit Availability Factor 98 71 72 21.

Unit Capacity Factor (Using MDC Net) 93 63 56 22.

Unit Capacity Factor (Using DER Het) 91 61 55 23 Unit Forced Outage Rate 2

3 15 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

TMI Modifications, December 15, 1980, 4 or 5 days tentative.

25 If Shut Down At End Of Report Period, Estimated Date 4.% u p : NA

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-010 UtilT Dresden I DATE Decerter 1,1980 COMPLETED SY, r,. Cieszkiewicz TELEPHONE (815) 942-2920 MONTH NOVEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MUe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

9 0

20 0

5 0

21 0

6 0

22 0

1 7

0 23 0

1 8

0 24 0

0 0

9 25

,i I

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

5 14 0

30 3

15 0

31 16 0

l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-237 UNIT nresden II DATE Decrater 1,1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 MONTH NO'/ EMBER. 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 386 17 362 2

383 18 353 3

370 19 351 4

382 20 236 5

371 21 198 6

368 22 369 7

367 23 354 8

379 24 124 9

368 25 155 10 360 26 359 ji 371 362 27 12 357 28

__.353 13 357 29 352 14 356 30 352 15 363 31 16 360

AVERAGE DA' Y UNIT POWER LEVEL

(

DOCKET NO. 050-249 UNIT Dresden III i

DATE December 1, 1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 MONTH NOVEMBER, 1980 DAY AVERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 446 17 783 2

67s 18 784 3

763 19 795 i

4 774 20 788 5

782 21 786 6

783 22 739 7

781 23 779 8

751 24 788 9

770 25 690 10 771 26 142 11 776 27 592 12 782 28 713 13 784 29 757 i

14 785 30 781 15 742 31 16 791 l

- -,, -.. _.. ~..., -..,

Util.i.t. I tref. 050-010 Uffit S!IOicotitis Ane P0isER REputTiolis tilll T II^lli-'~Eresden I UAIC November 1, 1980 C0llPLETE D IlY S. Cieszkiewicz TEl[PH0Hb815) 942-2920 REPORT HONill NOVEMBER'. 1980 "s.

b9 E

- s.

O v-g 1.lcensee St

'ce Cause C Corrective c

n e

Noo bate fj j

jy#

l.<ent

{}

83 Action to l

y p, Report i Prevent Recurrence m

c3 8

781031 S

720 C

3 Major work scheduled to be performed this outage:

i

1) IIPCI installation for ECCS upgrading t

i

2) Equipment upgrade to IEEE 279 t

j

3) Major Inservice Inspection

' 8 2,:,'

1 I

cji

4) Chemical Clenning q
5) Re fuel M

rae l

\\

0 3

\\

(82 g

c --

(BL

-l 2

Ft Forced Rensont G-Operational Error Is-o t lie r (Explain)

St scheduled A-Equipment Fallure (Explain) '

li-Otlier (Explain) 9-Halntenance of Test li Extilblt C-instructions.for C-Refuellng 3 Helhotle preparntion of Dato D-Rogulatory Restriction I-flahua l tntry Sheets fe-Licensee

(-Operator. training &Licensetxnmina 1

2-itonudl ternm Event heport (

jrfle(HUREG-F-Administrative

( )

j.Aut'oiimtle Scram 0161)

(

i

uisu.t i ne s. _010-2) L UHit 51111100W115 AND P05/ER REDUCT 10llS.

Ulli r NAHE__Dr_cmten II c

i DAlf December 1. 1980 E0flPLETED fly S. Cieszkiewicz 4

TELEril0tlE (815) 942-2920 i

REPORT P10 Nill NOVEMBER, 1980 a

t ti o,.9 t'

e-e, i

e 2U vE Licensee S#

E"o Cause & EcrrectIve

~

o e

No.

bate

[

$w Event

{}

}

Action to gv eg Report I Prevent Recur.ence in o

I 10' 801120 F

17.5 A

2 Mantially scrammed reactor - 2B CRD pump j

tripped,and failed to restart.

11

,801124 F

27.8 G

3 Reactor scrammed on Group I isolation while t

I.M. 's were performing !!SL hi flow sbrveil-

'1.,

Lance D1s 250-1.

o e-I 1

+

.,4 y

= -y c

n cm 6!-M em I

\\

$ 3

\\

@s)

\\

[E ra m

5.Q i

L l

1 FI forced Itenson t G-Operational Error is other (Explain )

St

$cheduled A-Equipment Fallure (Explain) '

ll-Other (Explain)

B-lialntennnce of Test li Exhlhit G-Instructlons.for C-Refueling 3 fictbod:

Preparation of Datn D-Itegulatory itestrictlun l-Itahunt intry Sheets Ie-licensco t-operator training & License txnmine 1

2-linnudl scram Event Iteport (

)ffleOlUREG-F-Administrative g'.

3.gog'om' nt le Scram 0161)

(

i

Out.l.l i fly. 050-241 Ullii 5llu10011115 AND POWER REDUC 110lls-Ulli t tiltlif _ Dresden III DAl[ December 1. 1980 i

CollPLEILD HY S. Cieszkiewicz 1 LLPal llE (815) 942_2_920___

REPORT H0 Hill NOVEMBER', 1980 4

m i

L

% w s",

  • l cn n

3U vE" 1.lcensee Pc E"o Cause f, Corrective

~ c o

y yj

{

j y.

]

No.

Date

'[ "3 3

Event Action to g --

eg Report #

vs Prevent Recurrence es l

15 801126 F

13.8 A

3 Reactor scrammed on Group I isolation.

Reactor mode switch contacts did not make up proberly when placed from Run to Startup and the unit went below 850# pressure.

I a

ia, l

4 o, :..'

,a l

f]

,7.((.

'b N

~

W.

(%

Idd G3

\\

ree i

q 9

6

)

O, a

i l

2 F:

forced Reason G-Operational Erre-Is otlier (Explain)

SI Scheduled A-Equipment Failure (Explain) '

ll-Otlier (Explain)

D-lialntenance of Test li Exhibit G-Instructlons.for C-Refueling 3 Helhod:

Preparation of Data D-Regulatoryitestridllon 1-Itanua l Entry Sheets fr-Licensec l

L-Operator,iralising & License Examina 1

2-Ilanudi Scram Event lieport (

JFile(NUREC F-Admlhistrative

/"T

'l-Au t'orna t i c St rain nl61)

/ i

DRESDEN UNIT 2 SAFETY RELATED MAltlTENAllCE-NOVEMBER, 1980 NATURE OF LER 04 OUTAGE HALFUNCTION-CAUSE RESULT CORRECTIVC" ACTION EQUIPHENT MAltlTENANCE NUMBER LPRM 08-49A Preventive WR #9423 Outage #2-9 NA t:A Ran DIS 700 no in-dication of error.

LPRM G2 LPRM 32-41D Preventive WR #9039 Outage #2-9 flA NA Ran DIS 700 no in-dication of error.

LPRM 08-33-B Preventive WR #5125 Outage #2-9 NA NA Ran DIS 700 no in-dication of error.

(Ch. 6)

  1. 2 Diesel Cen'.

Preventive WR #9119 Outage #2-9 NA NA Performed quarterly in-spection.

A0 1601-62 Valve Corrective WR #9608 Outage #2-9 Limit Switch Showed Double In-Adjusted limit switch.

Sticking dication w/ Valve in Closed Position

~

Grapple Monorail Preventive WR #9512 Outage #2-9 NA NA Jumpered upper limit switch for blade guide moving.

Refuel Grapple Preventive WR #8941 Outage #2-9 NA NA Pre-outage inspection.

Refuel Grapple Corrective WR #9717 Outage #2-9 De fective Latchlight Replaced microswitch.

Microswitch Non-Operative Interlock Doors Corrective WR #9995 Outage #2-9 De fective Interlock Relocated microswitch.

Microswitch Inoperative 4

1 4

4 r

DRESDEN UNIT 3 SAFETY RELATED f tAlHTENAIRE - NOVEMBER, 1980 NATURE OF LER OR OUTAGE HALFullCTION CAUSt.

RESULT CORRECTIVC' ACTION EQUIPMENT HAlllTENAllCE NUMBER 4

RBM #7 Preventive WR #9452 Outage #3-14 NA NA Replaced flow control LER #80-36/03L-0 trip re-sequence card.

HPCI MO-2301-4 Corrective WR #9688 Outage #3-14 Dirty Auxiliary Failed to Open Fron Cleancd contact.

LER #80-40/0lT-0 Contact On Control. Switch Closing Relay 1" Pipe Hanger.

Preventive WR #8792 Outage #3-13 NA NA Installed V-bolts &

Downstream MS clamps on hangers.

4 Valve CE Size 1 480V Preventive WR #4130 Outage #3-14 NA NA Changed plunger arm &

Safety-Related overload relay insulation.

Contactors A0-3-1301-20 Corrective WR #97?8 Outage #3-14 Open Neutral Fail to Open hPulled100'newcable, Valve LER #AO-41/03L-0 Between Control plugged fire stop at Room & Field panel.

?

e

DRESDEN UNIT 2/3 SAFETY RELATED HAf NTEllAllCE - NOVEMBER, 1980 NATURE OF LER OR OUTAGE HALFullCTI0li CAUSE RESULT CORRECTIVE'ACTl0tl EQUIPl1ENT liAlllTEllANCE NUl10ER Spare Recire.

Preventive WR #8270 NA NA Performed flow test Pump Seal per procedure.

Spare Recire.

Preventive WR #6831 NA NA bisassembled & rebuilt Pump Seal seal.

Spare Recirc.

Preventive WR #8271 NA NA Performed flow test Pump Seal per procedure.

Spare Recire.

Preventive WR #2871 NA NA Rebuilt per procedure.

Pump Seal Spare Recire.

Preventive WR #8231 NA NA Rebuilt per procedure.

Pump Seal Refuel Floor Preventive WR #9865 UA NA Adjusted door closure.

Interlock Door "B"

SBGT Preventive WR #8176 NA NA Removed sample cartridge per' procedure.

SBGT Charcoal Corrective WR #7011 Loose Bolts Leakage on Tightened bolts.

Adsorber Both Sides BK 7051 Spare Preventive WR #6421 NA NA Rebuilt valve & tested Electromatic per mfgr. specs.

1

SUMMARY

OF OPERATING EXPERIENCE UNIT ONE OCTOBER, 1980 i

I 11-1 to 11-30 Unit One was shutdown for the entire month, awaiting License approval for the chemical cleaning. Major work scheduled to be completed following chemical cleaning is as follows: RPCI installa-tion for ECCS upgrading, equipment up-grade to IEEE 279, major inservice in-spection, and refuel, i

i a

1 7

3

W I

1 i

SUMMARY

OF OPERATING EXPERIENCE UNIT TWO NOVEMBER, 1980 11-1 to 11-20 Unit Two started the month operating at a power level of 386 MWe.

On November 20, at 1643, the Unit was manually scrammed when 2B CRD pump failed to restart after four attempts.

11-21 to 11-24 The Unit was placed back on the system at 1013, reaching a power level of 354 MWe.

On November 24, the Unit scrammed on a Group I Isolation while performing a MSL Hi Flow Isolation Surveillance DIS 250-1, 11-25 to 11-30 The reactor was brought critical on t

November 25 and was placed back on the e

system at 1233 that same day. The Unit continued operating through the remainder of the month, reaching a power level of i

352 MWe, with a capacity factor and availability of 43% and 94%, respectively.

t

.a.. - -.....

SUMMARY

OF OPERATING EXPERIENCE UNIT THREE NOVEMBER, 1980 11-1 to 11-26 Unit Three started the month operating at a power level of 446 MWe, On November 26, at 0130, the reactor scrammed on a Group I Isolation when the reactor mode switch was switched from Run to Startup. Apparently, not all the contacts made up properly when the mode switch was placed in startup and a sub-sequent MSIV closure and scram resu,1ted when system pressure went below 850#.

11-26 to 11-30 The Unit was placed back on the system at 1520 on November 26, reaching a power level of 761 MWe, with a capacity factor and availability of 91% and 98%, respec-tively.