Summary of 800831,0901 & 1016 Meetings W/Util at Site to Review Selected Emergency Operating Procedures
ML19345D528
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8012160007
Download: ML19345D528 (3)


Text

WE$k' j

pa acog f,.

k UNITED STATES y i > wg g NUCLEAR REGULATORY COMMISSION

{g j

/

WASHINGTON, D. C. 20555

...../

gm DEC 011980 Docket No. 50-364 APPLICANT: Alabama Power Company FACILITY:

Joseph M. Farley Nuclear Plant, Unit 2

SUBJECT:

SUMMARY

OF JULY 31, AUGUST 1, AND OCTOBER 16, 1980 MEETINGS REGARDING REVIEW 0F OPERATING LICENSE APPLICATION The staff in Procedures and Testing Review Branch (D. Wigginton and B. Siegel) r have met with the applicant (Mr. D. Morey and Mr. L. Williams) at the Farley Nuclear Plant to review selected emergency operating procedures.

On July 31, 1980 and August 1, 1980, the staff discussed its comments and proposed modifications to the procedures, based on a detailed review.

Procedures reviewed were those for loss of reactor coolant, steam generator tube rupture, reactor trip, anticipated transients without scram, loss of main feedwater and inadecuate core cooling. Applicant revised its procedures, based on these comments. Three of these revised procedures were used in September 2 and SeptenDer 3,1980 to direct Farley Nuclear Plant operators through simulated accidents on the Zion simulator. These three procedures (loss of coolant, safety injection, and steam generator tube rupture) were further revised based on the results of the simulations.

On October 16, 1980, the staff, including Mr. E. Reeves, NRC Project Manager for Farley Unit 1, met with the applicant to walk through the small break loss of coolant accident emergency operating procedure in the Farley Unit 2 control room. This walk through was conducted using the updated procedure.

As a result of this walk through, a few minor changes were made.

The summary and conclusions of the staff's review of selected emergency operating procedures will be reported in Supplement 5 to the Farley 2 SER.

j..) f(?... k ' v L. L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page u

l 5

U h.

N GR S>

u,-

l l

eG

~;

e o

P B 012160 dd[

~4 Mr. F. L. Clayton, Jr., Senior Vice President Alabama Power Company DEC 01500 Post Office Box 2641 Birmingham, Alabama 35E91 cc: Mr. W. O. Whitt Executive Vice President Alabana Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Mr. W. Bradford NRC Resident Inspector P. O. Box 1814 Dothan, Alabama 36302 l

l l

i

[._

%