m0 Portland General Electric Company Trojan Nucicar Plant P.O. Bos 439 December 4, 1980 Rainier. Ore;;on 9704S CPY-1157-80 (503)556 3713 Mr. R. H. Engelken, Director U.S. Nuclear Regulatory Com=1ssion Region V Suite 202, Walnut Creek Placa 1990 N. California Blvd.
Walnut Creek, CA 94956
Dear Mr. Engelken:
Pursuant to the requirements of Trojan Standard Technical Specification 3.7.9, as modified by A=endment.50 concerning three-hour penetration fire barriers protecting safety-related areas, this is a 30-day Special Report equired by Specificacion 6.9.1.
The attached list denotes those pene-trations through three-hour fire barriers protecting safety-related areas that have been rendered nonfunctional for greater than seven days.
All ite=s on the attached list existed at the time Amendment 50 to Trojan Standard Technical Specification 3.7.9 was i=plemented at Trojan on October 28, 1980, and as such are being submitted as required by the Technical Specification.
Prior to rendering a fire barrier nonfunctional, hourly fire watch patrols are begun, fire detectors on at. least one si.e of the nonfunctional barrier are verified operable, and said fire patroir, are continued until the penetration has been returned to a functional status.
Ite=s P-21, P-22, P-23 and P-24 were returned to a functional status the week of November 24, 1980.
We are currently training various personnel as ;o the installation and inspection techniques of per=anent three-hour rated fire barrier material such that in the future no fire barrier will be breached for greater than seven days.
This training should be completed by December 5,1980.
Additionally, for those nonfunctional three-hour fire barriers, temporary fire barriers as recommended by American Nuclear Insurers are provided.
f3 Q
Sincerely,
{
md om Trq C. P. Yundt General Manager CPY/ASC:na S
Attachment c:
LER Distribution List t
80121500M S
P = PENETRATION t1 0 tl F U tl C T 1 0 N A L FIRE BARRIERS -
pgge 3.
'C = CONDUlT TAC #
l.0 CATION TYPE DEFICIENCIES REMARKS Service Water Pump Room Elect.
fleeds Capped Note 1 P-1 (West Wal1)
Wal1 Penetration'
\\
Cable Spreading Room Cable Tray Backside flot e 1 P-8 (West Walt Floor)
Penet.
Needs Fonm 1-Cable Sps'ading Room Cable Tray Backside Note 1 P-9 (We s t Wa,' t. )
- Penet, tieede Foam Cable Spreading Room Cable Tra'y Backside No e 1 P-10 (West Wall Floor Slab)
Penet.
Needs Foam Cable Spreading room Cable Tray Neede Foam flote 1 P-ll (North Wall Ceiling)
Penet.
Cable Spreading Room Cable Tray fleeds Foam Note 1 6 l P-12 (North Wall Celling)
Penet.
Cable Spreading Room dore for Needs Foam flote 1
'l P-13 r
Cable Spreading Room Elect. Cable Neede Foa' Note 2 i
P-14 (To C-41B Panel in Control Rm.)
i
/
C-41B Panel in Control Rm.
Elect. Cable Needs Foam No e 2 P-l 'i
(
l P-16 Heeds Foam Note 2 C-41B Panel in Control Rm.
Elect. Cable i
C-41B Panel in Control Rm.
Elect. Cable Needs Foam Note 2 P-17 C-41B Panel in Control Rm.
Elect. Cable Needs Foam Note 2 P-18 Cable Spreading Room to C19 Elect. Cable Needs Foam Note 3 P-19 in Control Room 3
1 C-19 Panel Control Room Elect. Cable Neede Foam Note 4 p_20 olI
P = PENETRATION NONFUNCTIONAI, FIRE BARRIERS Page 2 of 2 C = CONDUIT x
TAC #
LOCATION TYPE l>EFICIENCIES REHARKS Control Bldg. Elect.
Regrouted week of November 24, 1980 P-21 Aux. Hoom
. ' Cpre Drill Needs Crout Floor Slah
'N' l.ine P-22 Floor Stab 'H' l.ine Core Drill Needs Crout itegrouted week of November 24, 1980 P-23 East Wall Core Note Needs Crout Regrouted week of November 24, 1980 P-24 East Wall Capped and regrouted week of Pipe Penetratton Needs Grout and November 24, 1980 C8P Note 1 - Electrical penetrations were made due to RDC 79-51, installation of additional area radiation monitors.
Note 2 - Electrical penetrations were made due to RDC 78-49, installation of high range T.;ble gas monitors.
Note 3 - Electrical penetrations were made due to RDC 79-63, auxiliary feedwater low suction pressure trip modification.
Note 4 - Electrical penetrations were made due to RDC 79-99, auxiliary feedwater flow indication installation.
9
.