ML19345D392

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1980
ML19345D392
Person / Time
Site: Humboldt Bay
Issue date: 12/05/1980
From: Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19345D393 List:
References
NUDOCS 8012150046
Download: ML19345D392 (1)


Text

.

PACIFIC GAS 4.ND E LE C T RI C C O M PANY EOW3 l

77 BEALE STREET SAN FAANCISCO, CALIFOANIA 94106* (415) 7814211 TWX 910 372 6587 JAMES O giFFER CEPAATVENT OF NUCLE Am PLANT OPEnarcNs NUCLE AR POWER GENERATCN

,J December 5, 1980

~

Office of Management Information s

";i c

and Program Control N

U d.

~

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re:

Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for November, 1980. These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications.

Sincerely, E. D. Weeks Plant Superintendent Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc:

Mr. J. D. Shiffer Mr. R. H. Engelken, Director Directorate of Regulatory Operations Region V Office i

U. S. Nuclear Regulatory Commission CO8 1990 N. California Boulevard 3

Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596

![

EDWeeks:me 802225coWo f

-