Text
_. __ _ _ _ ____ _ ___.
ErwirJ Hints All 5'rt. Ce G'es tet o.a.4,asss ece Detroit 4
5 7.fl4l.5;+,~
?.'
November 25, 1980
- -.3 t
....., -~ 4 1 EF2-49,870 nm:
1 Mr. James C. Keppler, Director Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Clen Ellyn, Illiaois 60137
Subject:
Interim Report of 10CFR50.55(e) Item on Defective CE-I6SE Welds.
Dear Mr. Keppler:
On October 24, 1960, Detroit Edison's Mr. T.A. Alessi, Director - Project Quality Assurance, telephoned Mr. P.A. Barrett of NRC Region III to report on defective CE-ISSE welds at the Fermi 2 site.
A review of 19 radiographs in the C-33 syste=, which is a drain line to the reactor vessel, revealed that there =ight be problems with 7 out of the i
19 welds involved. These radiographs were previously accepted by a con-tractor that has since left the site.
Detroit Edison Engineering is presently analyzing the problem, and a final report will be submitted to you by February 24, 1981.
If you have ques-tions concerning this matter, please contact Mr. H.A. Walker, Supervisor -
Construction Quality Assurance.
Very truly yours, i/
sb.kWt N -L4 4
EH/ HAW /pn ec:
Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclea r Regulatory Coc=is sion Washington, D.C.
20555 Mr. Bruce Little, Resident ~ Inspector U.S. Nuclear Regulatory Co= mission
~..
Resident Inspectors Office 6450 North Dixie Highway Newpcrt, Michigan 48166 80/7