Responds to Item 2 of IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Required Piping Insps Completed 801010.Written Rept Will Be Submitted by 801109
ML19345D175
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/16/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
1-100-10, 2-100-12, IEB-79-17, NUDOCS 8012120099
Download: ML19345D175 (1)


Text

CENTRAL FILES POR:FQ l

stR

/

TIC NSIC APKANSAS PCWER & LIGHT CCMPANY PCST CFFCE eCx 551 UTTLE PCCK. AAKANSAS 72203 (501) 371-.:CCO z

October 16, 1980 s

5 2

ir

..n_

1 EE

=

2-100-12 9

05 1-100-10 5

.g m

K. '/. Seyfri t, Di rector Office of Inscection & Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One - Units 1 & 2 Occket Nos. 50-313 and 50-368 License Nos. CPR-51 and NPF-6 IE 5ulletin No. 79-17, Rev.1 Pipe Cracking in Stagnant 5 crated Water Systems (File: 1510.1. 2-1510.1)

Gentlemen:

This letter is to inform you that, in accordance with item 2 of the subject bulletin, all required piping inspections were comoleted as of October 10, 1980.

We are currently preparing a written report describing the results of these inscections. As recuired by item 6 of the bulletin, we will submit this report to yac no later than November 9,1980.

Very truly yours, bM (.V David C. Trimble Manager, Licensing DCT:0RH: 1p cc:

Division of Reactor Insoection Programs Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission Washington, D.C.

0555 Mr. W. D. Johnson o

U. S. Nuclear Regulatory Comission "

3 8 ] 2 () h [

f P. O. 5cx 2090 Rus s ell vi 11 e, AR. VEMBEA VICCLE SCUTM UT'Li??ES SYSTEV