ML19345D131

From kanterella
Jump to navigation Jump to search
Forwards LER 80-099/03L-0
Date released: 12/25/2019 Download: ML19345D131


LER 80-099/03L-0:on 801124,while Operating in Mode 1,at 83% Power,Sample Analysis of Safety Injection Accumulator 1C Revealed Boron Concentration in Excess of Tech Spec.Caused by Stagnant Solution Stratification in Accumulator
ML19345D132
Person / Time
Site: North Anna 
Issue date: 12/04/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345D132 (2)
Forwards LER 80-099/03L-0
ML19345D130
Person / Time
Site: North Anna 
Issue date: 12/04/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19345D130 (1)