Responds to IE Bulletin 80-11, Masonry Wall Design. Re-evaluation Program Will Be Completed by 810415
ML19345D058
Person / Time
Site: FitzPatrick 
Issue date: 11/04/1980
From: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-11, JAFP-80-856, NUDOCS 8012090003
Download: ML19345D058 (2)


Text

Yh m.i a POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRick NUCLZA R power PLANT S

RAYMOND J. PAsTERNAK P.O. BOX 41 Re,; dent Manager Lycoming. New York 13093 315-342-3840 November 4, 1980 SERIAL:

JAFP 80-856 Boyce H. Grier, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA.

19406

SUBJECT:

NRC I&E BULLETIN N0. 80 MASONRY WALL DESIGN

Reference:

Letter from Raymond J. Pasternak to Boyce H. Grier, Dated July 10,1980 (Serial JAFP 80-565)

Dear Mr. Grier:

The FitzPatrick Plant staff submits as Enclosure 1, infor-mation requested by paragraph 2.b. of the subject Bulletin.

In addition to the information contained in the enclosure, the status of the re-evaluation of masonry walls and schedule for completion of the re-evaluation is provided below.

The Power Authority and its architect-engineer staffs have identified 86 wall sections requiring re-evaluation because they either support safety-related equipment or piping or are in proximity to safety-related equipment. To date, approximately 22% of the wall sections have been analyzed and have passed the design (acceptance) criteria established for re-evaluation.

Re-evaluation of an additional 50% of the wall sections is in progress. The re-evaluation has not considered local stresses with respect to the mechanism for load transfer or the potential for block pull-out at this point in the re-evaluation prgram. gdditional re-evaluation which considers the potential for rN CN 3

Y?X 6.-

~

gg g

"y p.,

~

e '

"q g

a u

f 1:

v 8012o90003 0

b Boyce H. Grier, Director November 4, 1980 United States Regulatory Commission JAFP 80-856

SUBJECT:

NRC I&E BULLETIN 80-11 Page block pull-out will be undertaken and incorporated into the final results of the re-evaluation program. The completion of this program is scheduled for April-15, 1981.

Very truly yours, RJP:VC:brp RAYM0ND J. PASTERNAK Enclosure RESIDENT MANAGER DISTRIBUTION Subscribed and sworn to U.S. Nuclear Regulatory Commission before me this 4th day Office of Inspectior. & Enforcement of November, 1980 Division of Reactor Operations Inspection Washington, D.C.

20555

k. p>>wS_

George T. Berry, PASNY, NY0 (W/0 Enclosure)

G. M. Wilverding, PASNY, NY0 BEVERt.Y R.PRUc.at. pumgg J. P. Bayne, PASNY, NY0 Notary Public -State of % York R. Ram, PASNY, NY0 Appointed in osweso county ssi n Expires March 30.19M M. N. Brosee, PASNY, JAF NRCB 80-11 File Document Control Center NRC Resident Inspector R. F. Thiel, S&W, NY (W/0 Enclosure)