ML19345C755

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 800825-28
ML19345C755
Person / Time
Issue date: 10/08/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19345C749 List:
References
REF-QA-99900710 NUDOCS 8012080300
Download: ML19345C755 (1)


Text

.

National Valve and Manufacturing Company Johnstown Plant Docket No. 99900710/80-02 NOTICE OF DEVIATION Based on the results of an NRC inspection conducted on August 25-28, 1980, it appears that~certain of your activities were not conducted in accord;nce with NRC requirements.

Criterion V of Appendix B to 10 CFR 50 states:

" Activities affecting quality shall be prescribed by documented instruc-tions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, pro-cedures, or drawings.

Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accom-plished."

4 Deviations from these requirements are as follows:

l.

A.

Section 6 of the-QA Manual, paragraph 6.3.2, sub paragraph 3, states in

part,

" a blue-Nuclear I. D. tag shall be attached to each cart or pallet for identification through fabrication process."

j Contrary to the above, a pallet containing shop order No. 8002CC25 did not have a blue nuclear ID tag attached for identification through the fabrication process as required.

1 B.

Section 3 of the QA Manual, paragraph 3.4.10, sub paragraph 2, states in part, " Assembly Drawings and QC Data Sheets for all classes of '

component supports shall provide for documentation of the following:

t welder, filler metal, welding procedure, preheat and PWHT."

4 j

Contrary to the above, the assembly drawing and QC data sheet for shop order No. 8002 CC25 cid not provide for documentation of the I

welder, filler metal or welding procedure to be used in tack welding of item 5 -to item 4, in that the operation was not listed on the drawing or the QC data sheet as required.

i l

C.

Section 10 of the Quality Assurance Manual, paragraph 10.4.1, sub-para-

~ graph 1, states in part, "The QC Inspector shall record the NCN number on the QC Data Sheet or Assembly Drawing."

i Contrary tc the above, the QC inspector did not record the NCN number, NCN-J-1134, on the QC Data Sheet or Assembly Drawing for shop order i

8703 52604 for a part which was found to be nonconforming'although the NCN was attached to the assembly drawing.

(See Details, B.5.)

4 t

8012080] g

_.