ML19345C378

From kanterella
Jump to navigation Jump to search
Forwards SAR for Packaging Half Super Tiger,TES-PPD-3 Re Renewal of Certificate of Compliance 6679
ML19345C378
Person / Time
Site: 07106679
Issue date: 11/17/1980
From: Baer T
U.S. ECOLOGY, INC. (FORMERLY NUCLEAR ENGINEERING
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19345C379 List:
References
NUDOCS 8012040575
Download: ML19345C378 (1)


Text

'

hk 91-do"7f 2smmh3Aclear E11stillecting Co111 pally Illc.

4' @fi n s airr 9200 SHELBYVILLE ROAD. SUITE 526 P. O. BCX 7246

_,3%

LOUISVILLE. KENTUCKY 40207 PHONEi"~H 426-7160 9E0 TAC 2 M.).ll~D0 November 17, i T g

o, 9

]5 Mr Charles

., acDonald, Chief Transportit o " dft'ification Branch Division"lif"F el Cycle and Materia 1 Sa, y -0EC O i GB0 " k, c-E U. S. Nuclear Regulatory Conmission ggss

/;f y

Q Washington, DC '20555 atstcn0M

/.

i

'ei DocgtT ctERK '3-

~ _ _

7' g

Docket 71-66fI,'l

,-n-Half Super Ticer@ ShippinbiPackaos Y,.'

56 8*

c -

O

Dear Mr. MacDonald:

Nuclear Engineering Company, Inc. hereby submits the consolidated Safety Analysis Report for Packaging (SARP), HALF SUPER TIGER TES-PPD-3, dated May 1, 1980, as referenced in correspondence dated June 27, 1980, and October 28, 1980, concerning renewal of the Certificate of Compliance.

Aaditionally, eight copies of the current revision of each of the following drawings, as referenced in the SARP and current Certificate of Compliance are also included. They are:

Dwo. by Title Dwg. No.

Sheet No.

Rev. No.

PPI Super Tiger 32106-3 1

F PPI Super Tiger 32106 2

original PPI Argonne Transportation 32269 1&2 original Shield Body PPI ArgMne Transportation 32268 1

B Shield Assembly Q

g PPI Argonne Transportation 32270 1

hC Shield, Lid my g

g 2.

n ANL Waste Storage Bin M III CS-E-2273 1

02ginak g

.co m

PPI Half Super Tiger 32198 1

cei'gi nal o

iginab PPI Half Super Tiger 32197 1

E 6

Any communications concerning this application or the Certificate shoulo%e addressed to me at the above address.

i Thank'you very much.for your continued cooperation.

Sincerely, NUCLEAR ENGINEERING COMPANY, INC.

f" e

p L

5o t=

//.6;v,b x

  • ";f

,f p'

r

/

n..

Thomas S. Baer cD Vice President g

')

Enc.

b#%M 8 011!O40 $% '