Advises That Injection of Grout Into Voids Underneath Turbine Bldg Was Completed on 801028.Encl Table Includes Data for Each Hole in Which Grout Was Injected.One Oversize Drawing Encl.Pdr Drawing on Aperture Card Only
ML19345B579
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/26/1980
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML19345B580 List:
References
LAC-7253, NUDOCS 8012020100
Download: ML19345B579 (6)


Text

_.

'e e

D DA/RYLAND h

[k COOPERAT/VE

  • PO BOX 817
  • 2615 EAST AV SOUTH

-(608) 788-4000 November 26, 1980 In reply, please refer to LAC-7253 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:

Mr. Dennis M. Crutchfield, Chief-l Operating Reactors Branch No. 5 Division of Operating Reactors l

U.

S. Nuclear-Regulatory. Commission Washington, D. C.

20555 l

SUBJECT:

DAIRYLAND POWER COOPERATIVE f

LA CROSSE-BOILING WATER REACTOR (LACBWR)

L:OVISIONAL OPERATING LICENSE NO. DPR-45 GROUTING OF VOIDS UNDER TURBINE BUILDING MAT

REFERENCES:

(1)

NRC Letter, Crutchfield to Linder, dated July 28, 1980.

(2)

DPC Letter, Linder to Crutchfield, l

LAC-7100, dated August 25, 1980.

l (3)

DPC Letter, Linder to Crutchfield, f

LAC-7131, dated September 9, 1980.

Gentlemen:

Reference 2 notified you of our intention to inject grout into areas l

of concern to alleviate any potential for reduction of Turbine Building integrity due to the ' presence of voids underneath the Turbine Building mat.

In order to complete this task, additional holes were cored in the Turbine Building floor and DPC utilized the services of the Prepakt Concrete Company of Wisconsin Dells, Wisconsin, to pump cement base intrusion grout. into the voids under controlled pressures.

Injection of grout commenced on October 21, 1980, and was completed'on October 28, 1980.

The basic grout mix was composed of the following materials:

Type I Portland Cement---------2 bags 0 49 p;unds each Flyash-------------------------I bag

@ 75 pounds-Additive (Intrusion Aid)-------l bag

@ 2 pounds 10 ounces Water--------------------------13 gallons l~

Total Volure-------------------Aporoximately 3.5 ft3 1.

The contractor stated that this grout mixture cn<

nds slightly when setting and this was verified by taking snall s lEs"JdE"the time the grout was being injected.

$3 M 3.N -

$\\ T) 8012020 joy f3 gY:+

'Mr.1 Dennis M.

Crutchfiel'd, Chief LAC-7253 Operating Reactors Branch No.;5 November 26, 1980 TA. written grouting procedure was reviewed by the LACBWR Operations Review-Committee, approved by the LACDWR Superintendent, and implemented

'during grouting operations.

The procedure called for stopping the-injection of grout if pressure reached 10 psig or increased rapidly, if leakage-of grout from other holes cored in-the floor or from seans between concrete slabs was_ observed, or-if any~ indication of structural.

Jeffects'becane evident.'

Enclosure l'.provides a table.which; includes data for.each hole into-which grout was; injected, and Enclosure 2 includes blueprints

  • of concrete below'the Turbine Building and'lB Diesel Building which designate hole nunbors and locations.

No. cracking.or_other indication of structural effects. as a. result of grouting were noted.

If further information.is-necessary, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE IW

!d tL JH

. Frank Linder, General Manager FL: FAD: abs Enclosures

  • NOTE:

One copy of blueprint forwarded with this letter; additional copies to follow.

CC:

J. G.

Keppler, Reg. Dir., NRC-DRO III NRC Resident Inspectors-t

- 2c-l Ll-.-.... -- - -.--.-.--.

l. L:--

...~

~ -

E TURBINE BUILDING DATA ENCLOSURE 1 Cubic Feet

. Thickness ~

Void Thickness Of Grout Dates Grout Maximum IIole ' No.

Diameter Of. Concrete Below Concrete Injected Was Iniected Pressure Observed 1

1-3/4" '

15" 2"

24-1/2

.Oct. 21 10 psig-2-

1-3/4"

'16" 2-1/2" 17-1/2

.Oct. 21 Spiked to'40 psig 3'

2" 14" 4"

28 Oct.-21 & 22 Spiked to 20 psigi 4-2" 15-1/2"

.4" 10-1/2 Oct. 22 10 psig 5

-2" 15" 5-1/4" 3

Oct.'22 10 psig i

6 2"

16-1/2" 6-1/2" 14 Oct. 22 10 psig 7

1-3/4" 16" 6"

45-1/2 Oct..'22 10_psig 8

2" 15-1/4" 1"

1/8 Oct. 22' Spiked to 30 psig 9

2" IS" 5"

14 Oct. 22 10 psig 10 2"

16-1/2" 1"

,2 Oct. 22 Spiked to 40 psig 11 1-3/4" 16-3/4" l-3/4" 3-1/2 Oct. 22 10 psig 6-1/4"*

33 Oct..22' 10 psig

~12 1-3/4" 28-3/4 13 2"

13-3/4" l-1/2" 16 Oct. 22 10 psig-14 1-3/4" 15-1/4" 8"

98 Oct. 23 5 psig**

15 2"

36" 2"

3-1/2 Oct. 22 & 23 Spiked to.40.psig 16 2"

17-1/2" 1-1/2" 0

Oct. 23 10 psig 17 2"

16" 1"

~0 Oct. 23 10 psig 18' 2"

16-1/2" 2-1/4" l-1/2 Oct. 23 10 psig 19 2"

17" 1/2" 1/2 Oct. 25 10 psig 20 2"

16-1/2" 3/4" 3/4 Oct. 23 10 psig 21 2"

16-1/2" 3-1/2" 1

Oct. 23 10 psig 22 2"

23"

< 1" l-1/2 Oct. 27 10 psig-23 2"

24-1/4" l-1/4" 3/4 Oct. 27 10 psig 24 1-3/4" 16-1/2" 2-1/2" 7

Oct. 27

.10 psig 25 2"

19-1/2" 1"

1/8 Oct. 27 10 psig 26 1-3/4" 18-1/2" 4"

133 Oct. 27 & 28 1

psig***

  • NOTE:

An accurate reading for this hole was not possible due to difficulty drilling through concrete.

The final section of core has to be hammered out of the bit and was driven into the sandy soil.below the. concrete.

f TURBINE BUILDING DATA - (Cont'd)

ENCLOSURE 1

    • NOTE:

Injection of grout was secured at 5 psig due to the emergence of water from the NE corner of the machine shop office and watery grout from the joint of the concrete floor slab at the NW corner of the machine shop along piping through the floor.

      • MOTE:

Injection of grout was secured due to the proxinity of the vertical tunnel wall which drops to elevation 629 and the large volume of grout injected.

The distance from the surface of he floor to the final level of grout in the hole was 15" which indicated a level 3-1/2" above the bottom of the concrete slab.

.