Text
'*
s' e
t I
James W Cook j.
Vsce Preuls.st - Projects, Engsneersng 1
/
und Casstructson Genered of4ces: 1945 We,t Parnall Road, Jackson. MI 4920) * (S t M 7840453 November 21, 1980 3
bY Director of Nuclear Reactor Regulation
',, -(
Att Darrell G Eisenhu., Director 3.:a K
$j -
,Z Division of Licensing United States Nuclear Regulatory Commission
- -j
~
Washington,.DC 20555 g
t; y
w MIDLAND PROJECT DOCKET NO 50-329, 50-330 AMENDMENT NO 85 FILE: 0485.16 0485.11 UFI:
71*01*11 71*01 00234(S)
SERIAL:
10112 Enclosed herewith is Amendement 85 to the Company's Application for Construction Permits and Operating Licenses containing three (3) signed originals and sixty (60) copies of:
- 1. Answers to Questions 39 through 53 (except for part (1) (c) of Question 45 which will be answered at a later date after discussions with the NRC, staff and their consultant, ETEC).
- 2. Update of the previous information supplied, including piezometer readings, settlement readings, plots of cross-sections of new borings, conunitment dates provided in responses to Question 23, settlement profiles, and a plan view e,f boring locations.
With respect to Question 37, we believe that this amendment as well as the information supplied in Amendment 81 satisfies the concerns raised in Question 37, i'
Proof of service upon the parties listed in the revised Service List attached to Mr S A Varga's November 30, 1977 letter as modified by Mr S A Vargs's letter of April 24, 1978 is being provided under separate cover.
I James W Cook
\\
h(oO JWC/RLT/cr sl oc1180-0099a100 i
8011200083 k
1
o.
ss CONSUMERS POWER COMPANY
' APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICE!!SE DOCKET NO 50-329 DOCKET NO 50-330 l
AMENDMENT NO 85 J
Enclosed herewith, revising and supplementing the above-entitled application, i
are revised and new pages for incorporation in the Responses to NRC Requests Regarding Plant Fill. The Responses to NRC Requests Regarding Plant Fill was referenced by Amendment 72 to the above dockets on December 19, 1979 The t
enclosed material consists of the-following:
1.
Responses to Questions 39 through 53, except for part (1) (c) of Question 45 which will be answered later.
2.
Update of piezameter readings.
3.
Update of settlement readings.
4.
Update of the plots of cross sections for new boring locations, j
5.
Update of the commitment dates provided in the responses to Question 23.
[
6.
Update of settlement profiles for underground piping (Figures 17-2, 19-1.)
7.
Updata of-the plan view of boring locations (Figure 24-9 Revision 10.)
L 8.
Revision of the response to Question 25.
9.
. Attachment 27-1 to Question 27, " Vibratory Settlement of Diesel i
Pedestals."
- 10. Attachment 27S-1 to Question 27, " Diesel Generator Building Report on Sondex Gauges and Borros Anchors - Volume I and II."
J Consumers Power Company Dated November 21, 1980 By r
G
/ ames W Cook, Vice President
-r.
i
/
/
f
. Sworn and subscribed to before me on this 21st day of November, 1980.
/a n Notary Public, Jackson County, M/chigan My commission expires September 8, 1984 I
oc80-0101a100 l
I
~.
h 0-e James W Cook Vice Presdent - Projects. Engsneenng and Constructson oeneret offices: 1945 West Pernait Road, Jackson, MI 49201
- 15171 788-o453 November 21, 198v.
- ~g 55 Director of Nuclear Reactor Regulation
..C, y),,, ~
Att Darrell G Eisenhut, Director Division of Licensing
=.y 3
United States Nuclear Regulatory Commission j
w-j
~
Washington, DC 20555 l2 s
()
w MIDLAND PROJECT DOCKET NO 50-329, 50-330 AMENDMENT NO 85 FILE: 0485.16 0485.11 UFI:
71*01*11 71*01 00234(S)
SERIAL:
10112 Enclosed herewith is Amendement 85 to the Company's Application for Construction Permits and Operating Licenses containing three (3) signed originals and sixty (60)-copies of:
- 1. Answers to Questions 39 through 53 (except for part (1) (c) of Question 45 which will be answered at a later date after discussions with the NRC staff and their consultant, ETEC).
- 2. Update of the previous information supplied, including piezometer readings, settlement readings, plots of cross-sections of new borings, commitment dates provided in responses to Question 23, settlement profiles, and a plan view of boring locations.
With respect to Question 37, we believe that this amendment as well a<a the information supplied in Amendment 81 satisfies the concerns raised.a Question 37.
Proof of service upon the parties listed in the revised Servi.e List attached to Mr S A Varga's November
".0, 1977 letter as modified by Mr S A Varga's letter of April 24, 1978 is being provided under separate cover.
p lJamesWCook
\\
Qh JWC/RLT/cr vk
\\
l 1
l l
oc1180-0099a100 lI
e 1
1 CONSUMERS PCWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE l
DOCKET NO 50-329 DOCKET N0 50-330 AMENDHENT NO 85 1
i Enclosed herewith, revising and supplementing the above-entitled application, are revised and new pages for incorporation in the Responses to hRC Requests Regarding Plant. Fill. The Responses to NRC Requests Regarding Plant Fill was referenced by Amendment 72 to the above dockets on December 19, 1979. The enclosed material consists of the following:
1.
Responses to Questions 39 through 53, except for part (1) (c) of Question 4
j 45 which will be answered later.
2.
Update of piezameter readings.
3.
Update of settlement readings.
4.
Update of the plots of cross sections for new boring locations.
5.
Update of the commitment dates provided in the responses to Question 23.
6.
Update of settlement profiles for underground piping (Figures 17-2, 19-1.)
7.
Update of the plan view of boring locations (Figure 24-9 Revision 10.)
8.
Revision of the response to Question 25.
- 9. 7-1 to Question 27, " Vibratory Settlement of Diesel Pedestals."
- 10. Attachment 27S-1 to Question 27, " Diesel Generator Building Report on Sondex Gauges and Borros Anchors - Volume I and II."
Consumers Power Company 1
Dated November 21, 1980 By
.i 43ames W Cook, Vice President
/
/
Sworn and subscribed to before me on this 21st day of November, 1980.
La-Notary Public, Jackson County, M/chigan My commission expires September 8, 1984 oc1180-0101a100 4
-y
.~,r--,
-