ML19345A835

From kanterella
Jump to navigation Jump to search
Forwards LER 80-036/03L-0
Date released: 12/25/2019 Download: ML19345A835


LER 80-036/03L-0:on 801023,during Power Ascension Testing, Reactor Protection Sys Channel D Tripped on High Power. Caused by Reversal of Upper & Lower Detector Signal Cable Connections.Cables Switched & Recalibr
ML19345A842
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/20/1980
From: Bates R
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345A842 (1)
Forwards LER 80-036/03L-0
ML19345A834
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/20/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345A834 (1)