ML19345A796
| ML19345A796 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/10/1980 |
| From: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8011250206 | |
| Download: ML19345A796 (1) | |
Text
.. %
- , s*y -
1 3.'.3 tC 2.,
-: 2 50 WISCONSIN Electnc m cwmr 231 W. MICHIGAN, P.O. 80X 2046. MILWAUKEE WI 53201 MV!CES a
>c November 10, 1980 m
& ' h b' &
Director of Regulatory Operations gi-JOd U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
MONTHLY OPERATING REPOP""S POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1980.
Very truly yours, O
Executive Vice President Sol Burstein Attachment Copies to J. G. Keppler - MRC NRC Resident Inspector i
l C. F. Riederer - PSCW l
l Blind copies to Messrs. C.
S. McNeer, R. H.
Gorske/A. W. Finke, C.
W.
Fay, D. K. Por'er7 G. A.
- Reed, Gerald Charnoff, E.
L. Zebroski (NSAC) 08 1
//
8011250$0b y
L
ERAT 5NG DATA REPORT I
Z jy o
DOCVET NO. 50-266 g
{.
O na m
o 7
@Q
[
DATE November 5, 1980 1
n
' g "o o m
n>
I g
g
- o,n g
COMPLETED BY C.
W.
FAY t:
e g
I SO a
TELEPHONE 414 277 2811
/ O9 O
N rn 0 0
p%"
OItJT DEACH tJUCLEAR PLANT,UtlIT 1
. tJOTES
" ~J z
IOD:.
OCTOBER 1980 y
p d
t3AL POWER (MWT):
1518.
IllG (GROSS MWE):
523.8 9/ h$
ICAL RATIf4G.(tJET MWE):
8497.
I 1DABLE CAPACITY (GROSS MWE):
519.
t MH JDARLE CAPACITY (NET.MWE):. 495.
(,UR Iti CAPACITY RATINGS (ITEMS tlUMDEP 3 THROUGli 7) SINCE LAST REPORTe GIVE l'EASONS:
I C ABl.E l'
0 WHICil.MESTPICTEDe IF At1Y (ifET MWE):
390.0 f
PESTPICTIONSe (IF ANY):
hERxATdMAWxidfX Power restriction is the result of a self-imposed ore average temperature in an attenyt to inhibit corrosion of steam generator tubes within the tubenheet crevice.
THIS mot 1Til YR TO DATE CUMLfLATIVE 11'. HOURS I'H REPORT'NG PEIUOD..
~
I
- 745, 7e320 87e5%2
- 12. NtJMOEM OF llOtfRS REACTOR WAS CPITICAL 745.0 6,225.8 72,742.3
- 13. REACTOR PES 8.PVF SHt8T00WN HOURS 0O 19.5 601.7
- 14. IlOURS GEtli RATOR ON LItJE 745.0 6:075.2 70e469.2 i
- 15. UtlIT RERFPVI; $11UTDOWN llOllRS 0.0 152.8 755.2 l
- 16. GR OS TilFRMAl. ENFRGY CFNERATf D (MWill 901,8710 7e331e09' 96 e 003 e tW4
- 17. GROS 9 FLtCTRICAL FNERGY GENI' PATED (MWH) 293e160 2e381 960 33e015e710 5
- 18. NFT l'LI.CTRICAL ENFRGY GENI.RATFD (MWill 277,200 2 249,770 31,439 e % 8
- 19. UNIT SERVICE.FACTOP 109.0 83,0 00.5 i
- 20. UNIT AVAILADILITY FACTOP.
100.0 85.1 81.4
- 21. UtilT CAPACITY FACTOR (US{flG MDC NET) 75.2 62.1 73.7
- 22. UNIT CAPACITY FACTOR (llSING DER.NI T) 74.9 61.8 72.3
- 23. OrliT FOPCFD OUTAGE RATE 0.0 0.1 3.3 i
- 24. SHUTDOWNS !.CHEDULED OVFR NEXT 6 MotJTils (TYPEe DATER AND DilRATION OF EACill:
I Unit scheduled to shut down November 28, 1980, for approximately five weeks for refueling.
- 25. iF SituTDOWN AT EtJD OF REPOPT PER500, ESTEMATEP DATE OF STARTitP!
NOT SH1'TDOWil l
DATA RFPOPTf D ANU rACTOD9 Chi (.lfl. ATFD A9 PFOltF';TFD it! 8.'PC 1 FTTrP OkTFD 9FPTIPDrP 2Te 1977 f
4 IO
.