Final Deficiency Rept Re Loose Bushings in Pipe Support Sway Struts.Struts Found with Loose Bushings Will Be Replaced. Corner & Lada 800724 Rept Encl
ML19344F375
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/24/1980
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To:
Shared Package
ML19344F370 List:
References
10CFR-050.55E, 10CFR-50.55E, SLNRC-80-32, NUDOCS 8009150196
Download: ML19344F375 (10)


Text

> -. _..

a J

SNUPPS Standardised Nacieer Unit h Mont System 5 choke Cherry Road Nicholas A. Petrick noekvme. Merviend 20eso Executive Director (301) see soto July 24,1980 SLNRC 80-32 FILE: 0491.10.2/M-218C SUBJ:

Corner & Lada Furnished Pipe Support Sway Struts Mr. Boyce Grier Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Ref:

STN 50-482 STN 50-483 STN 50-486

Dear Mr. Grier:

On May 13, 1980, NRC Region I (McGaughey) was informed by telecon by the SNUPPS QA Manager (Seiken) of generic deficiencies in the pipe support sway struts furnished by Corner & Lada, Inc., to Callaway and Wolf Creek sites.

The specific deficiencies identified involve the clamp end of the sway strut becoming loose from and possibly being disengaged from the bushing.

Under seismic conditions disengagement of the paddle from the bushing could overstres's the piping systems resulting in potential safety concerns covered by 10CFR50.55(e) regulations.

Subsequent investigation since the May 13th telecon notification has reaffirmed this initial con-

-clusion.

Enclosed with this letter is a generic report covering the defective pipe support sway struts furnished by Corner & Lada.

This report provides a chronology of events associated with discovery of the defective sway strut assemblies; summarizes safety implications associated therewith and out-lines a program of follow-up corrective actions initiated or contemplated to resolve this problem. The plan provides for on site inspections and/or tests sufficient to assure strut assemblies are tight and acceptable for use.. Struts found with loose bushings will be replaced.

i

SLNRC 80-32 Page Two It should be noted that the enclosed report is being treated as a final submittal under 10CFR50.55(e) definitions The corrective action plan outlined in the enclosure will be monitored by Callaway aid Wolf Creek site QA personnel.

In the event additional actions are required or should complications result in the implementation phases, a supplemental report will be prepared and forwarded to NRC.

In the interim, further questions may be addressed to Mr. S. J. Seiken SNUPPS QA Manager at (301) 869-8010.

Very ruly yours, R.W\\CN Nicholas A. Petrick SJS/bds/lb9

Enclosure:

Report on Corner & Lada Sway Struts cc Mr. J. A. Keppler, Director, Region III USNRC Mr. Karl Seyfrit, Director, Region IV, USNRC Mr. Victor Stello, Jr., Director, Office of Inspection and Enforcement, USNRC, Washington, D.C.

Document Management Branch, USNRC, Washington, D.C.

98 e

a h

SLNRC 80-32 Page Threa bec:

E. W. Creel KGE'

,G. L. Fouts KGE/WC M. L. Johnson KGE F. D. Field UE L

D. F.Schnell UE.

W. H. Weber UE/ CAL 4

8 b'

a f

s

('

e

+

(

4 I-s.

.. ~..

10CFR50.55(e) REPORT on Loose Bushings In Pipe Support Sway Struts Supplied By Corner & Lada Co., Inc.

For Callaway Unic No.1 (Union Electric)

And Wolf Creek (Kansas Cas and Electric Co.)

i' Bechtel Power Corporation i

Caithersburg, Maryland L

July 24, 1980 a

j

c.

v P

p.

TABLE OF CONTENTJ s

1.0 INTRODUCTION

2.0 DESCRIPTION

OF REPORTABLE DEFICIENCY 3.0 ANALYSIS OF SAFEIY. IMPLICATIONS 4.0 CORRECTIVE ACTION M

4 9

4 9

1.0 INTRODUCTION

In accordance with the requirements of 10CFR50.55(e), this report is

. prepared to provide a summary of the deficiency related to loose bushings in' pipe support sway struts supplied by Corner & Lada Co., Inc. (C&L),

Cranston, Rhode Island to Union Electric's Callaway Unit No. 1 and Kansas Gas and Electric's Wolf Creek Generating Station.

In November,1979, Bechtel was informed by a Nonconformance Report generated at the Wolf Creek Jobsite, of the existence of loose bushings in six size 1, 2, and 3 pipe support sway strut assemblies (C&L Fig.

No. 631 - see attached C&L Engineering Standard Page No. 5-42).. This deficiency was reported, as a potential significant deficiency per 10CFR50.55(e) to the NRC I&E Region IV by Kansas Gas and Electric Co.

(KGE) on 11/8/79.

In a meeting'between C&L and Bechtel representatives in Gaithersburg,

)(aryland on 11/20/79, it was agreed that C&L would conduct a tensile test to demonstrate the ability of size 1, 2, and 3 sway struts to

~

carry the specified design'1oads using sway struts with loose bushings and, further, that C&L would arrange for inspection of bushings in all

~

size 1, 2, and 3 sway struts available at Callaway and Wolf Creek Jobsites at that time.

Since the problem appeared to be confined to size 1, 2, and 3 sway strut bushings only, C&L was requested to inspect only 10% of sway struts of other sizes (4 through 10) delivered to the jobsites.

Further, C&L was asked to inspect all future shipusnts of sway strut bushings (regardless of size) for tightness, prior to final assembly, on 12/5/79, three samples of size 1 and 3 each (six samples total) of sway struts were tested by C&L to determine if the sway struts with loose bushings would perform their intended design function and with-The tests were performed'vich loose stand the allowable f a' lted load.

rear bracket bushings.

Since size 2 and 3 sway strut bushings, rear bracket, and paddle ends are identical, the size 3 test was performed 1

..L..

Testing by C&L was witnessed by a Bechtel representative.

for both sizes.

i The tests indicated that the struts will perform their design function even with loose bushings and withstand the allowable faulted loads.

Based on the ' test results, it was concluded that this deficiency was not a significant reportable deficiency per 10CFR50.55(e) or 10CFR Part 21 and the NRC I&E Region IV was advised accordingly by KGE on 1/25/80. No indepth study or test was performed at this time to determine whether or not the paddle could become disengaged from the bushing since existing spacing configurations provided by C&L appeared too small for this possibility to occur.

11/28/79, All size 1, 2, and 3 sway struts (749 total), delivered prior to were inspected and all bushings found loose were reworked (" staked" -

displacement of metal in close proximity to the bushing by using a center punch and hammer) by C&L personnel at the Wolf Creek Jobsite between 11/30/79 and 2/20/80.

Similarily, all size 1, 2, and 3 sway struts (732 total), delivered prior to 11/28/79, were inspected and all loose bushings found were " staked" at the Callaway Jobsite between 1/21/80 and 2/15/80.

Subsequently, KGE QA surveillances identified size 2 and 3 sway strut clamps with sufficiently large spacing to permit possibility of the Bechtel requested paddle becoming completely disengaged from the bushing.

C&L to perform a test to determine if the paddle, under these conditions, could become completely disengaged from the bushing at the clanp end.

C&L informed Bechtel on 5/8/80, that, for size 2 and 3 struts, it is possible for the bushing to become completely disengaged from the paddle at the clamp end. On 5/12/80, Bechtel concluded that this new condition; i.e., bushing disengagement, was a significant problem reportable to the NRC per 10CFR50.55(e) and the NRC I&E Region I was advised accordingly by SNUPPS and Bechtel on 5/13/80.

The same deficiency was also reported, pursuant to 10CFR Part 21, to the NRC I&E Region I by Bechtel on 5/14/80.

3

2.0 DESCRIPTION

OF RE' PORTABLE DEFICIENCY Loose bushings in size 2 and 3 sway struts at the clamp end can result in the sway strut paddle becoming completely disengaged from the bushing, causing a 3/8" gap between the innersurface of the paddle and the pin.

Existence of the gap, during a seismic event, may result in piping and/or piping welds being overstressed causing a possible safety hazard.

3.0

, ANALYSIS OF SAFETY IMPLICATIONS Pipe support sway struts are used throughout the plant, including safety related piping systems, to support piping.

Bechtel's piping stress analysis is based on the assumption that the sway struts are The existence of a 3/8" gap has not been considered rigid components.

in the piping stress analysis.

The existence of a 3/8" gap between the pa'ddle and the pin during a seismic event, has since been evaluated and may result in piping and/or piping welds being overstressed due to movement of the piping system. This overstressed condition could result in a significant safety hazard, due to possible failure of the pressure l

boundry.

l l

4.0 CORRECTIVE ACTION C&L has strengthened their QC inspections of all sizes of sway strut bushings.

All hole diameters are now checked and the bushings are staked and inspected for tightness using a special tool developed by All struts are also checked 100% for tightness by the Bechtel i

C&L.

Supplier Quality Representative at C&L prior to final release for

. shipment.

The results of those' inspections ~are docu=ented.

Receipt

. inspections since January,1980, at the jobsites have not identified any. loose bushings in-C&L sway struts received at the jobsites since that time. As indicated under " Introduction," all size 1, 2, and 3

-~._w.-...._..m_m.._.m.___

...e r-

f. sway struts shipped to SNUPPS jobsites prior to 11/28/79, were inspected and staked by C&L personnel at Callaway and Wolf Creek Jobsites. A few bushings inspected 'and " staked" at the jobsites have since become loose.

To provide additional assurance of the quality of these items, all C&L sway struts, regardless of size, will be visually inspected and examined or tested for tightness prior to use. These inspections will be in accordance with designer specified criteria and will be documented at each site. Any struts found with loose bushings will be replaced.

e Y

e 0

e b

'/ ADJUSTMENT)-.

PIN (Typ. Both Ends)

L ( %(

5 i

D 8

e, l

7

[- BRACKET END IlUI[l. $14){J L

Y H-G ROD END (R.

.J 00 END (L.H.)

l.

. sEXTENSION v-N_

%g PIECE

- n,..__________.-_ pM!' M _

Ct-p

[j,"j,",

,,,',~ ]

k)

],[ i

)' f.

---K.

A Y

~

HAM NUT F

.r X

CIAMP tv* sic s:

Gr.a.s. Ftt:tr5 END

.Gemase Fit:teg

~

FIG. N 631 -tm CAasen sTest ct 4up

//

F IG. N 63 2 wim ALLCY,Ct AMP

[ff T

.I-1-

4 8

r,= %

=

L 0

(

f

... =g% ~p j

= A, g.'

L_

~-

-F..

e q,

,L,

-)

9 PADDLE..

USHING I

(Typ. Both Ends) 634

-I FIG. N FIG. N 633 1 qa 13 h

.wim ERACK'E7 d

y

$h\\

r on e st_0N E

/

FIFE $1ZE ST1 TUT SII' 0

I I 2.31 4.5 t 6,7 i 8 I 9.10 I 11 l

Jy

3. 3s l l

l l

B lll l l E

1.32 t.66 3.50 l l

-l

'T l.90

4. se 1 7.00 1.00 2.00 s.22 5.13 l 7.c0 2.38 5.3s t 7.00 n.12

,__. p 2.ss MPE RMP 3.00- 4.06 3.98 1.00 j 2.00 8.12 l I-I ws mor3 4.13 4.56 6.50 7.25 I 7.25 8.3sI ti.ssl12.00 7.75 7.75 f.12 l s.se l4 a.63-5.63 s.3s io.noi 10.00 FIG. N637 FI G. N 63 5 c^nsc~ srrrt 5.69-6.69 RsAR ERACC F IG. N 63 6 'At2.ar cuaw

  • :i'I ij:38 ij:38

'j:25 : ij;25F,i2;63

,i2;j3 10.88-12.81 11.88 11.88-13.88 13.88 15.38 ; 15.63 12.88-14.06 12.63 H 12.63 14.50 14'.50 16.00 f.16.25 14.1)-16.06 13.63 13.63 15.25 15.25 17.13 l17.15 16.13-is. 6 14.63 14.63 is.3s 16.3s is.25iis.ss

% OEG, 18.13-20.06 15.75 45.63 17.75 17.75 19.25' 20.00 20.ts-2s.c6 is.13 is.13 a.ss tv.ss 21.75 22.25 Specify FIG. No. 8 Strut S t=e 8 24.13-30.06 21.25 t 21.25 23.001 23 00g25.00 26.25 l

Pipe Size, ard 'L' Dimension.

30.13-36.06 26.00l2s.00 26.501 26.50i2s. 3 29.50

=.

=

c-c m;g-l; P

R T

=m s"u. A B

C D

F

=

m.I m.

uu o.

s=

1 850 0.75 2.00 2.00 0.63 1.88 4.63 18.25 60.00l 0.372-0.374' l.25 0.38

"_',,.0,,.

2 1500 1.00 3.25 2.00 1.38 2.00 5.63 20.25 106.006 0.767-0.749 1.25 0.50 lb" 40 l

3 4500 1.00 3 25 2.00 1.386 2.00 5.88 20.25 120.00t 0.767.0.J'9 t.25 0.50 2"

60 l,

8000 1.25 6.50 3.00 1.38 2.50 6.63 22.25 120.001 0.997-4.999I t.50

0. 8 '25" 4C I

5 120C0 1.50 6.53 3.00 1.38 2.50 7.00 23.25~

120.00 0.997-0.9998 1.50 0.75 3

'O

~#M 3

6 16000 1.75 5.38-3.69 l.69 3.25 8.00 26.75 120.00 1.267-1.249s 2.00 1.00 7

21000 2.00 5.38 I 3.69 t 1.691 3.25 8 25 27.75 820.00h I.247-1.24 2.00 1.00 3"

'O 4

27500 2.25 6,121 4.638 2.004 4.00 9.63 38.75 120.001 1.497-1.&99( 2.50 1., 2 ]_,_4 " ' O.

9 34000 2.50 7.854 5.751 2.38i 5.00 10.13 13&.25 120.00i 1.747-1.7&96 3.00 1.75

'O ENGIN.t.RINr u

to 4 60000 3.00 10.12i 6.501 2.75i 5.75 12.63t al.001 120.004 1.997-l.999i 3.63 2".E 6"

'O 11 lt10000 4$00 16.006 3.75) 3.38I 7.25 16.75 l 4 7.75 l 120.001 2.4?7a2.499 i 5.00 2.25 8"

80 STANDARD

((OFOC.rbLCdC(O.,inC.

FIG. No. Nc31 thru N C37

,._ I W'

W#

M "b

R.!GC) SWAY d. ed.JT A.S5 EME LY

~

e...

rnae" kun C

14 O vu1" f if L.' ) tha!se n

i ere

.