Amend 2 to License DPR-75 Permitting Special Low Power Test Program to Be Conducted
ML19344F302
Person / Time
Site: Salem 
(DPR-75-A-002, DPR-75-A-2)
Issue date: 08/22/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19344F303 List:
References
NUDOCS 8009150109
Download: ML19344F302 (7)


Text

.

L/

y{for n$0 u

AUG'.2 ice 0 UNITED STATES

/

j NUCLEAR REGULATORY COMMISSION

,y ec 5

WASHINGTON, D. C. 20555

'%/

e

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY AND ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATICN, UNIT NO. 2 AMENDMENT TO LICENSE Amendment No. 2 License No. OPR-75 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated August 7,1980 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission 's regulations set forth in 10 CFR Chapter I; S.

The facility will operate in confomity with the license, as amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Conmission 's regulations; D.

The issuance of this amendment will not be inimical to the ccrnon defense and security or to the health and safety of the public; and E.

The issuance of this rendment is in accordance with 10 CFR Part 51 of the Conmission 's regulations and all applicable recuirments have been satisfied, 80 09150 k.

i

.. 2.. Accordingly,. the licanse is amended by the addition of Section 8.16 to Appendix A of the Tachnical Specifications. This addition permits Public Service Electric and Gas Company to perform the special icw power test program identified in Conditions 2.C(6)b and c of License No. DPR-75.

This license is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 2, are hereby incorporated into the license. PSE&G-shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY CCPMISSICN f,

, [

-f

!, s..-

N. :.- -.

~ H. R. Denton, Di rector Office of Nuclear Reactor Regulation

Attachment:

Page 8-3 to the Technical Specifications (Appendix !.)

Date of Issuance: Aug 3g je30

SUU-- w.

ATTACHMENT TO LICE!!SE AMENOMENT NO. 2 LICENSE NO. OPR-75 DOCKET NO. 50-311 Replace the folicwing page of the Appendix "A" Technical Specificatiens with the enclosed page. The revised page is identified by amendment number and contains a vertical line indicating the area of change.

Page 8-3

((:

i

a a

AUG 2: IcB0 8.11 Prior to startup folicwing the first regularly scheduled refueling outage, the licensees shall install a second level of under-voltage protection for the emergency buses.

t 8.12 Prior to startup following the first regularly scheduled refueling outage, the licensees shall add a fuse in series with the primary device of each one of 12 circuits fed from 230 volt ac motor control centers to provide backup protection for reactor containment electrical penetrations.

Each fuse shall be located in an independent compartment in the control center of the present primary device.

8.13 Prior to startup following the first regularly scheduled refueling outage, the licensees shall submit for our approval the results, which are applicable to Salem Unit 2, of tests to study mixing of added borated water and cooldown under natural circulation conditions.

3.14 Prior to exceeding 50 percent power, the licensees shall complete the preoperational testing of the remaining three of six circulators to be tested in the main condenser for the circulating water systen.

8.15-The licensees shall also report for the Salem facility any information reported for !.he Hope Creek facility relating to circumstances which suggest that the risk frcm flammable gas clouds (resulting from river traffic accidents on the Delaware River) may incraase to unacceptable levels.

8.16 For the conducting of the low power test program only, the licensees have ceen granted an exception from the requirements of those Technical Speci-ficatiens identified in Table 6.1 of our Safety Evaluation dated August 2 11980, related to the Special Low ihr Test Program.

SALE:4 - UNIT 2 8-3 Amendment flo. 2 s