TOLEDO EDISON Docket No. 50-346 License No. NPF-3 Serial No.1-157 uno p. caoust V'O'"
4 August 14, 1980 14191259-5221 Mr. James Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Dear Mr. Keppler Enclosed is Toledo Edison's response for Jhuis-Besse Nuclear Power Station, Unit 1 to IE Bulletin No.79-01B. The attached report super-cedes completely the attachment of our initial submittal on April 3, 1980 (Serial No. 1-124). Revision 1 applies to items 1 through 5 of your bulletin to the extent that information is available.
The following ? svisions, additions, and/or deletions are provided:
- 1) Additional evaluation work sheets were included to address components that are subjected only to increased radiation doses due to recircu-lating fluid following a LOCA. Note that only radiation and aging is addrassed on these sheets. These evaluation work sheets are refer-enced on the master list and index sheets with a "A".
- 2) Existing evaluation work sheets were revised to include new radiation doses based on the required operating times.
- 3) A new section, Section 3.V was added. This section tabulates to vendors for additional qualification documentation. It is this section that will be referenced on the evaluation work sheets in the " Qual." column under " documentation reference."
All revisions are indicated by revision bars in the margins.
Deletions in sections 2.2, 2.3, 2.5, L,, 2.9, 2.10, and 2.16 resulted from reevaluations showing these items did not meet the engineering safety feature definitions of item 1 in the subject bulletin. Review of the qualification data available has shor:. that all the equipment has met the qualification specifications.
1 M
ps 16 @
vhild
~
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TiLEDO. OHIO 43652
- Disoogy
i
- s
^..
We are continuing to work with vendors to determine more detailed qualification information of the equipment. In some cases, where data was not available, we have made provisions to replace existing equipment, and those are noted in.the evaluation work sheets.
Some replacements are being accomplished during our current refueling outage, but are not
- reflected in this revision. They will be included in future revisions.
In other cases, we are attempting to obtain qualification data and a list of materials used in the equipment so that an evaluation can be completed.
As sufficient amounts of new information becomes available, we will forward this to your office.
Very truly yours, f f v ^ = '- "
RPC/LCS Enclosure ks c/21/93/07 cc: Luis Reyes, w/o U.S. Regulatory Commission, w/a Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 R. W. Reid, Chief, w/a Operating Reactors Branch No. 4 Division of Licensing U.S. Regulatory Commission Washington,.DC 20555 s
t
..s
- tr e
Wf MV M-F P*=-6% E.Jupebutde p
W ee.&
- heoneM.e e h
a
.i SUBMITTAL IN PARTIAL RESPONSE TO IE BULLETIN 79-01B FOR THE DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 FACILITY OPERATING LICENSE NPF-3 This response is filed in accordance with 10CFR50.54(f). This letter provides information relating to the environmental qualification of Class IE equipment at the Davis-Besse Nuclear Power Station, Unit 1.
ff
- :== ^
R. P. Crouse Vice President, Nuclear Sworn to and subscribed before me this fourteenth day of August, 1980.
W Notdry Public LINDA L COSTELC Notary Public - State of Ohio My Oommission Expires Feb. 9,1932 E