Alabarn] Power Company 600 North 18th Street gl Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-100
M RC R 8ICN.~.'
T ' 4\\NTA CT *!L F. L CLAYTON, JR.
L Alabama Pbwer Senior Vice President
- 0 SEP 2 All
- 33
,ne sov,mo,ec,nc sxs,em August 29, 1980 Docket No. 0-348 No 50-364 Mr. James P. O'Reilly U. S. Nuclear Regulatory Comission Region II Suite 300 101 Marietta Street, N.W.
Atlanta, Georgia 30303
Dear Mr. O'Reilly:
I. E.Bulletin 80-19, entitled " Failures of Mercury-Wetted Matt f-Relays in Reactor Protective Systems of Operating Nuclear Power Plants Designed by Combustion Engineering," requested that each licensee and each holder of a construction permit determine whether or not mercury-wetted relays were used in the Reactor Protection System in their facilities.
In accordance with this request, Alabama Power Company conducted a review of the Reactor Protection Systems at Farley Nuclear Plant Units 1 and 2.
It was determined that no mercury-wetted relays were utilized in the Reactor Protection System in either Unit 1 or 2 at Farley Nuclear Plant.
If you have any further questions, please advise.
Yours very truly, 9
k n[h h
F. L. Clayton, Jr.
RWS:de cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintnar Mr. W. H. Bradford Office of I & E Director, Division of Reactor Operations Inspection Washington, D. C.
Office of I & E Division of Construction Inspection Washington, D. C.
Mr. M. D. Hunt, I & E Region II 8009110 N f
~UiFIClAL COPV