ML19344E814
| ML19344E814 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/29/1980 |
| From: | Widner W GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-15, NUDOCS 8009110676 | |
| Download: ML19344E814 (1) | |
Text
Georg a PoAer Company 4 I
[
230 Peachtree Street Post 0"(e Box 4545 Aranta. Georg a 30302 Tetephone 404 522-6060 f e.NRC REGi -
- . ' N Tf,, r. : ~ ?,
m r,
g 3J GeorgiaPower
]-(
W. A. Widner Vce Presde-t and General Manacer Nuc: ear Generaton
~
the Southem electrc system August 29, 1980 U. S. Nuclear Regulatory Commission
REFERENCE:
Office of Inspection and Enforcement pt,1PO ~
Region II - Suite 3100 101 Marietta Street, NW G30.-321/50-36D Atlanta, Georgia 30303 I&E Bulletin 80-15 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:
On June 26, 1980, an inspection was made by maintenance and telephone company personnel to verify that the Emergency Notification System (ENS) is powered by the telephone company. This inspection confirmed that the ENS is indeed powered by the telephone company.
On August 15, 1980, a test was conducted to ensure that the ENS extensions operate independently of the plant phones. This test was performed satisfactorily under test or experiment request (TER) 80-12.
As a part of this test power was tripped to all plant phones, and all extensions of the ENS were verified to be operable during this loss of power.
Administrative procedure HNP-36 has been approved and will be issued prior to September 1,1980, to provide instructions for notifying the NRC Operations Center in the event that one or more extensions of the ENS is found to be inoperable for any reason.
If you have any comments or questions, please contact this office.
Very truly yours, l
l
@./
W. A. Widner DLT/mb xc:
Director of the Office of Inspection and Enforcement Director of the Division of Operating Reactors, Office of Nuclear Reactor Regulation O0091 0
6 1
OFFICIAL CO _,
n
\\
_. _.