ML19344E694

From kanterella
Jump to navigation Jump to search
Provides Subcommittee on Energy & Power W/Nrc Rept, NRC Plan for Cleanup Operations at TMI-2. Portions of Plan Subj to Change as Cleanup Work & Related Investigations Continue. W/O Encl
ML19344E694
Person / Time
Site: Crane 
Issue date: 08/15/1980
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Dingell J
HOUSE OF REP., INTERSTATE & FOREIGN COMMERCE
References
NUDOCS 8009020482
Download: ML19344E694 (1)


Text

i

@Nh fDL e

UNITED STATES

[

NUCLEAR REGULATORY CON.'.ilSSION j

2 g

E WASHINGTON, D. C. 20555

\\,*****/

g.; 15 YM3 Docket No. 50-320 h

2 o

The Honorable' John D. Dingell, Chairman Subcomittee on Energy and Power Comittee on Interstate and Foreign Comerce United States House of Representatives l

Washington, D.C.

20515

Dear Mr. Chairman:

Enclosed, for the information of your Subcomittee, is a copy of the report, "NRC Plan for Cleanup Operations at Three Mile Island Unit 2."

This report, prepared by the NRC staff, outlines the NRC planned actions during the Three Mile Island Unit 2 cleanup operations. Since major uncertainties in the condition of the l

reactor plant currently exist, portions of this plan are subject i

to modification as cleanup work and related investigations continue.

[

However, the estimated schedule together with the milestones dis-I cussec in the NRC plan would provide an adequate planning base for I

the NRC actions.

l Sincerely, c

V

[

r William J. Dircks,' Acting Executive Director for Operaticns

Enclosure:

NUREG-0698, "NRC P1an for C1eanup Operations'at TMI-2" cc:

Rep. Clarence J. Brown 800902048 2