ML19344E648

From kanterella
Jump to navigation Jump to search
Forwards LER 80-122/03L-0
Date released: 12/24/2019 Download: ML19344E648


LER 80-122/03L-0:on 800811,during Steady State Operation at Full Power,While Performing HNP-2-3001,reactor High Pressure Instrument Test,Switch 2B21-N023C Actuated at 1,068 Psig. Caused by Setpoint Drift.Switch Recalibr
ML19344E652
Person / Time
Site: Hatch 
Issue date: 08/26/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344E652 (1)
Forwards LER 80-122/03L-0
ML19344E647
Person / Time
Site: Hatch 
Issue date: 08/26/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344E647 (1)