Alf ama Power Company 600 North 18th Street Post Offica Box 2641 Birminghlm. Alabama 35291 Telephone 205 250-1002 L
F. L CLAYTON, JR.
senior vic. pre.ioent Alabama Power the southem electrc system August 19, 1980 Decket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 LICENSING ISSUES Gentlemen:
Based on discussions with NRC Staff personnel, concerns were expressed with regard to shift manning, low power test procedures, high range radiation detection, fire protection and security.
Enclosed is Alabama Power Company's position on each of these issues.
If you have any questions, please advise.
Yours very truly, b
L. Clayto
, Jr.
RWS/rt Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. W. H. Bradford fo l
o s
///
i 800gogyo g
ENCLOSURS 1.
Shift Mannina (I.A.I.3)
Concern 1.
The licensee should submit a shift schedule for the period frca September 1980 to September 1981 indicating who will fill each shift position, i.e.:
A - Unit 1 and Unit 2 SRO 8 - Unit 1 RO only C - AP0/E0 2.
Provide the number cf R0/SR0 personnel presently licensed along with the number of personnel expected to be licensed during the period of September 1980 - September 1981, including the number of persons expected to not satisfactorily complete the requirements for either a R0 or SR0 license.
Resconse 1.
Information requested was telecopied August 19, 1980.
2'.' Alabama power v'll define lead shift supervisor functions in separate
~
correspondence later this week.
d 2.
Low Power Test Procedures (I.C.7)
Concern It is necessary that the NRC (NRR) receive confirmation that the NRC onsite inspector (Mr. W. H. Bradford) has received Westinghouse comments on the above procedures.
Response
On August 15, 1980, Mr. W. H. Bradford was provided with Westinghouse letter APW-A-5296 dated August 1,1980, which transmitted comments on the Low Power Physics Test procedures.
w.
9 y
3.
High Range Radiation (II.F.1)
Concern The licensee should commit to install, by January 1, 1981, permanent radiation monitors for the Steam Jet Air Ejectors, Atmospheric Reliefs, and Main Steam Safety Valves. These monitors should have a range of up 5
to 10 pci/cc for the Steam Jet Air E]e: tors (and hoggers if different 3
release point) and 10 pci/cc for the steam reliefs and safeties.
~
Response
Alabama Power Company is in the process of developing design to meet the January 1, 1981, requirements.
This design will meet all objectives for monitoring releases from the Steam Jet Air Ejectors, Atmospheric Reliefs and Main Steam Safety Valves.
Preliminary evaluation of a schedule to install these monitoring systems indicates it will be possible to meet the January 1,1981, date; however, all aspects of the schedule have not been finalized.
Once this is done a firm schedule will be transmitted.
r
- s i
l l
l
'I
4.
Fire Protection Concern 1.
Prior to initial fuel loading the licensee should complete construction of Safe Shutdown Areas (i.e., Hot Shutdown Panel).
2.
_All smoke detection equipment installation should be completed by late October.
3.
One system was identified that does not meet code requirements.
This item should be resolved by late October.
Response
The above three concerns werc cddressed in a letter from F. L. Clayton, Jr.,
to A. Schwencer dated August 18, 1980.
This letter was telecopied to Mr. L. L. Kintner August 18, 1980.
s r
f l
l
5.
Physical Security Concern NRC had concerns in the following areas of the Joseph M. Farley Modified Amended Security Plan:
1.
Clarification of electronic searching of employees.
2.
Locking of the control room door.
3.
Clarification of the comtrol room being a vital area.
4.
Implementation schedule of security system.
5.
Comnitment to 10CFR73.55(d)(9) for changing cores and locks upon termination of employment of any enployee who had access to cores or locks.
Response
Items 1-4 above were contained in a response telecopied to Mr. Jerry Ennis on August 15, 1980.
Also a letter of transmittal was +.elecopied to Mr. Ennis on August 18, 1980, confirming the telecopied information, Item 5 will be carried as on open item.