Mod 4,extending Period of Performance & Funding Incrementally W/Added Workscope to Quantitative Classification of Two-Phase Flow Regimes Using Global & Local Neutronic Perturbations II
ML19344E405
Person / Time
Issue date: 08/04/1980
From: Morton K, Ryan J
NRC OFFICE OF ADMINISTRATION (ADM), WASHINGTON, UNIV. OF, SEATTLE, WA
To:
Shared Package
ML19344E399 List:
References
CON-FIN-B-6324, CON-NRC-04-78-245, CON-NRC-4-78-245 NUDOCS 8008280524
Download: ML19344E405 (4)


Text

-

Modification No. 4 1 m,i Supplem2ntal Agreement to U

Contract No. NRC-04-78-245 SUPPLEMEtiTAL AGREEMENT BETWEEN THE UNIVERSITY OF WASHINGTON AfiD THE U. S. IJUCLEAR REGULATORY COMMISSION THIS SU,'PLEMENTAL AGREEMENT, effective the 1st day of May

, 1930, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the "Governmant"), as represented by the UNITED 5IATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Commission"), and The University of Washington (hereinafter referred to as the " Contractor"),

WIItiESSETil THAT:

as nereinaf ter WHEREAS, the parties desir'e to modify Contract No. NRC- 04-78-245 provided, and this supplemental agreement is authorized Ty law, including the Energy Reorganization Act of 1974, as amanded, and the Atomic Energy Act of 1954, a's amended.

NOW, THEREFORE, said contract is hereby modified.as foll..<s:

Appendix A, attached to this supplemental agreement and made a part hereof, supsersedes Modification No. 3 and provides for the research to be performed 1.

by the Contractor during the contract period specified therein.

2.

In Article II - The Period of Performaace, the date " September 30, 1982"

~

is substituted for the date " April 30, 1980 3.

In Article III - Consideration, the sum "$ 262,252.00 is substituted for the sum "$ 207,252.00".

~ ~ ~ ~

~~..._.

7 140di fica tien ib. 4 Supplccental Agreczer.-

Contract flo. NRC-C4-78-24 Page !!o. 2 Ill WITt;ESS WHEREOF, the aarties have executed this document.

UN TE b STATES OF "4 ERICA BY: C e

'km Kellogg V.i Morton Contractinci Of ficer (ti tie)

Nuclear Regulatory Commission THE UNIVERSITY OF WASHINGTON SY:

N

-w-J. F V Ryan, Vij President for Business and Finance August 4.

1090 (title)

, certify that I am the I,

Barbara J. Zimernan (attester)

Secretary, Board of Regents of' the Contractor named (title)

J. F. Ryan under this document; that (signatory) who signed this document on behalf of said Contractor was then h

_ of said Contractor; t at vice President for 3 + -,==

,a w -,--,

this document was duly signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal powers.

1H WITilE55 WHEREOF, -I have hereunto affixed my hand and the seal of said Contractor.

[M g+

(SEAL)

F.aoification :'o. 4 Supplemental Agree:Ent Contract No. NRC-04-78-2 CONTRACTOR:

THE UNIVERSITY OF W.4SHINGTON APPENDIX A

. For the Contract period May 1, 1980 through September 30, 1982 Article A-I RESEARCH TO BE PERFORMED BY CONTRACTOR (a) The unclassified scop.e of work under this contract entitled "Quanticative Classification of Two-Phase Flow Regimes Using Global and Local Neutronic Perturbations II" is as follows:

1.

Conduct extensive parameter variatior, in the UWNR two-phase flow classification experiment.

2.

Perform analytical modelling of two-phase flow stochastic characteristics.

~

3.

Plan and design a loml/globaT two-phase flow experiment in PBF.

Analyze LOFT data to investigate usefullness of SPNDs and fissio[i chambers 4.

for in-core flow characterization.

5.

Invest'igate auxiliary / complementary techniques.

~

(b) The Principal Investigator expects to' devote,the following approximate amount (s) of time to the contract work:

Or'. R. W. Albrecht 100% of his time 2 mo. summer,1980.

100% of his time 2 mo. ' summer; 1981.

100% of his time 2 mo. summer,1982.

201, of his time 9 mo. academic year 1980-81.

20% of his time h mo. academic year 1981.

20% of his time 8h mo. academic year 1981.

20% of his time mo. academic year 1982.

I ARTICLE A-II WAYS AND MEANS OF PERFORMANCE (a)

Items for which support will be provided as indicated in A-III, below (1)

Salaries 'and Wages

$ 206,952.00 (2)

Equipment to be purchased or fabricated by the Centractor

$ '20,288.00 o

.p Modification N3. 4 f'

Supplemental Agreement to Ccntract N2. NRC-04-78-245 Appendix A Page 2 Items in excess of $1,000.00 Option 265 for HP54518 Fourier Analyzer:

Model 7970E Subsystem, 9 Track, 45 ips,1600 BD... $ 11,800.00 Cabinet for Magnetic Tape System Option 130, Single Bay, 56-inch................. $ 2,700.00 13401A Record / Reproduce Heads (1").........

$ 2,500.00 (3)

Travel (i)

Domestic 9,600.00 (ii)

Foreign

.0 -

(4)

Other direct costs including fringe benefits.

(5)

Indirect costs based on a predetermined rate of 57 perecnt applicable to salaries and vases.

(b)

Items, if any, significant to the performance of this contract, but excluded from ccmputation of Support Cost and from consideration in proportioning costs:

NONE (c)

Time or effort of Principal Investigator (s) including indirect costs and fringe, benefits contributed by Contractor but excluded from ccm-putation of Support Cost and frca consideration in proportioning costs:

Professor Robert W. Albrecht -

20% of his time for the nine-month period in academic year 1980-81 20% of his time for the 1/2 month academic year 1981 20%.of his time for 81/2 month. academic year 1981 Article A-III 20% of his time for 1/2 month academic year 1982 The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $ 422,778.00 ; the Ccmmission will pay 100 percent of the actual costs of these items incurred during the contract period stated in this Appendix A, subject to the provisions of Article III and Article l

B-XXVIII.

The estimated NRC Support Cost for the contract period stated in this Appendix A is S 422,778.00.

~

The estimated NRC Support Cost is fund'ed as. follows:

(a)

Estimated unexpended balance frca prior period (s)

$ (b)

New funds for the current period

$ 55,000.00 l

(c)

Funds to be provided subject to their av ilability in FY 81

$234,054.00 l

(d)

Funds to be provided subject to their availability in FY S2

$133,724.00

(e) The new funds being added in A-III(b) constitute the basis for advance pay ents prcvf ded under Article B-X.

-