Informs That CPC 800821 Response to NRC Addl Info Request Re Generic Issue of Onsite Power Sys - Degraded Grid Voltage, Was Erroneously Addressed.Should Be Addressed to Director of Nuclear Reactor Regulation,Attention DM Crutchfield
ML19344E333
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/22/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML19344E334 List:
References
NUDOCS 8008280401
Download: ML19344E333 (1)


Text

.

.s

[

%h CO M m 8f8

?

4 POW 8r

%gf Company

@[U[S 3EV a.a r.: on.c..; si2 w..e eca's.a Ave'u J cm.oa. uica+o.a **20s

^<.. coo. sir 7as osso August 22, 1980 Secretary, US Nuclear Regulatory Cc==ission Att Chief, Docketing and Service Section Washington, DC 20555 DCCKET 50-155 - LICE':SE DPR-6 BIG ROCK POIIIT PLA?C - IDITCRIAL CORRECTICN Consu=ere Power Company's letter dated August 21, entitled, " Response to Generic Issue - Degraded Grid Voltage" to the NEC, was addressed in error.

This letter was addressed to Mr Ja=es G Keppler, USNRC, Region III Office of Inspection and Enforcement, but should have been addressed to Director, Nuclear Reactor Regulatien; Att Mr Dennis M Crutchfield.

Consu=ers Power Ceepany requests this letter be included under Docket 50-155 to correct the record.

David P Hoffern (Signed)

David P Hoffman Nuclear Licensing 1.d=inistrator CC JGKeppler, Office of Inspection and Enforce =ent, Region III Director, Office of Inspection and Enforce =ent; Att Director, Division of Reactor Construction Inspection Director, Office of Nuclear Reactor Regulation Attach =ent - August 21, 1980 CPCo letter

?

/

LOh'>t soo8c8oVOI p