ML19344D608
| ML19344D608 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/21/1980 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19344D609 | List: |
| References | |
| NUDOCS 8004250193 | |
| Download: ML19344D608 (4) | |
Text
tumnasy f
UNITED STATES Q y [1., e gj NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C 20555 1, pyrN, l
- g 9 /,#
VIRGINI A ELECTRIC At_4D___ POWER COMPANY DOCKET NO. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OP_ERATI_NG _ LICENSE Amendment No. 58 License No. DPR-32 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated August 31, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 3.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security'or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
1 s Agy uomo
2-r 2.
Accordingly, paragraph 3.G.(2)(b) of Facility Operating License No.
OPR-32 is hereby amended to read as follows:
(b) Temporary containment and ventilation systems shall be installed and operated -for all cutting and grinding operations involving components with removable, radioactive 4
l contamination greater than 2200 DPM per 100 cm' except-when the Health Physics Coordinator for the Steam Generator i
Repair Program; determines, based on an evaluation involving ALARA considerations, that their use will increase overall occupational radiation exposure to workers involved in the repair activities.
i 3.
This license amendment is effective. as of the date of its issuance.
i FOR THE NUCLEAR REGULATORY COMMISSION hylg2t'lOV i
i A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: March 21,-1980 4
I l
4 k
E I
4 9
v v
r p
p
/.
UNITED STATES NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20555 y
%,*****/
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-281 SURRY POWER STATION, UNIT NO. 2 AME_NDMENT TO FACILITY OPERATISG LICENSE Amendment No. 57 License No. DPR-37 1.
The Nuclear Regulatory Connission (the %caission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated August 31, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confor1nity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l l
l l
l L
2-2 Accordingly, paragraph 3.G.(2)(b) of Facility Operating License No.
DPR-32 is hereby amended'to read as follows:
(b) Temporary' containment and ventilation systems shall be installed and operated for all cutting and grinding operations involving components with removable radioactive 2
contamination greater than 2200 DPM per 100 cm except when the Health Physics Coordinator for the Steam Generator Repair Program determines, based on an evaluation involving ALARA considerations, ihat their use will increase overall occupational radiation exposure to workers involved in the repair activities.
3.
This license ' amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k}aat& v A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating. Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: Marcn 21, 1980
\\
f h
^
.