Responds to IE Bulletin 79-27, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation. Review Identified Two Instrument Panels Lacking Direct Loss of Power Alarms.Direct Alarms Added
ML19344D592
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/28/1980
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-27, TAC-42663, NUDOCS 8004250077
Download: ML19344D592 (2)


Text

.

bec to DAC:ADM:

CENTRAL FILES POR:HQ LPOR M

b g Nebraska Public Power District ' EEsyy NSIc i STATE February 28, 1980 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 Subj ect: IE Bulletin 79-27, Loss of Non-Class 1-E Instrumentation and Control Power System Bus During Operation

Dear Mr. Seyfrit:

This letter is written in response to IE Bulletin 79-27. The responses listed below address the respective actions to be taken by the licensee.

la.

The alarms and/or indication provided in the control room to alert tae operator to a loss of power to a bus have been reviewed and idantified.

Ib.

The effects of the loss of instrument and control system loads connected to each instrument bus have been evaluated, including the ability to achieve a cold shutdown conditicn.

ic.

Our review has identified two instrument panels which lack direct loss of power alarms or indications. Direct alarms or indications will be added during the first outage of sufficient duration after receipt of hardware.

2.

Our existing procedures required to be used during loss of power to each 1-E and non-class 1-E bus were reviewed to insure that they; included the considerations of items 2a, 2b, and 2c of the bulletin.

The procedures are currently being revised to reflect the two instru-ment panels identified in Ic above, and the procedures will again be modified after the direct alarms or indications have been added.

3. IE Circular 79-02 was re-reviewed. Based on our re-review, no modi-fications of design or administrative controls are planned.

As usual, the details of this review and evaluation are available at the station for I&E review.

goo 42so 0 77

Mr. Karl V. Scyfrit February 28, 1980 Page 2 Should you have any questions concerning this matter, please do not hesitate to contact me.

Sincerely, A

Jay M. Pilant Director of Licensing and Quality Assurance JMP:PJB:cmk cc: U.S. Nuclear Regulatory Connission Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, DC 20555 l

!