Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. Notifies That Circular Sent to Listed Licensees on 800201
ML19344D337
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/14/1980
From: Carroll D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8003120075
Download: ML19344D337 (4)


Text

,-

s TIC

/jo recg'o, UNITED STATES l\\

j NUCLEAR REGULATORY COMMISSION

.+/ 1 k h "p #

e REGION lil 799 ROOSEVELT ROAD g, v j GLEN ELLYN. ILLINolS So137 fE.b i s MEMORANDUM FOR: Those on Attached List FROM:

Dorothy E. Carroll, Acting Chief, Administrative Branch

SUBJECT:

IE CIRCULAR NO. 80-02 The attached IE Circular No. 80-02, titled " Nuclear Power Plant Staff Work Hours" was sent to the following licensees on February 1, 1980 for information:

American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)

Cincinnati Gas & Electric Company Zimmer (50-358)

Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)

Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)

Byron 1, 2 (50-454, 50-455)

Dresden 1, 2, 3 (50-10, 50-237, 50-249)

La Salle 1, 2 (50-373, 50-374)

Quad-Cities 1, 2 (50-254, 50-265)

Zion 1, 2 (50-295, 50-304)

Consumers Power Company Big Rock Point (50-155)

Midland 1, 2 (50-329, 50-330)

Palisades (50-255)

Dairyland Power Cooperative LACBWR (50-409)

Detroit Edison Company Fermi 2 (50-341)

Dow Chemical Company (50-264)

Illinois Power Company Clinton 1, 2 (50-461, 50-462)

S0031a00$

~

4

(

9 FEa 1419:0 Those on Attached List "

Iowa Electric Light & Power Company Duane Arnold (50-331)

Iowa State University (50-116)

Michigan State University (50-294)

Northern 'rdiana Public Service Company Bailly (50-367)

Northern States Power Company Monticello (50-263)

Prairie Island 1, 2 (50-2S2, 50-306)

Ohio Edison Company Erie 1, 2 (50-580, 50-581)

Ohio State University (50-150)

Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)

Purdue University (50-182)

Toledo Edison Company Davis-Besse 1 (50-346)

Union Electric Company Callaway 1, 2 (50-483, 50-486)

University of Illinois Lopra (50-356)

Triga (50-151)

University of Michigan (50-002)

University of Missouri Columbia (50-186)

Rolla (50-123)

University of Wisconsin (50-156)

t 4

{ -.* '

[

[

I 3-

[ES J,,,a Those on Attached List i

+

Westinghouse Nuclear Traning Reactor Zion (50-087)

Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)

Wisconsin Public Service Corporation Kewaunee (50-305) i 2

~

9.

< /

c2 t. L4. 8 L 4+.(

f, orothy E/ Carroll, Acting Chief Administr'ative Branch

Enclosure:

IE Circular No. 80-02 t

T 4

f

. I i

i 4

4

.p 3

-w+-s-y 9

9 +

,-g p-

,+

w-w-

'.W-

.ew--p p

4 e

Addressees - Memorandum dated February 4, 1980 IE Files MPA/DTS Central Files Reproduction Unit NRC 20b

l SSINS No.

6830 Accession No.-

UNITED STATES 7912190657 NUCLEAR REGULATORY COMMISSION l

OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 February 1, 1980 IE Circular No. 80-02 NUCLEAR POWER PLANT STAFF WORK HOURS Description of Circumstances:

Studies indicate that with fatigue, especially because of loss of sleep, an individual's detection of visual signals deteriorates markedly, the time it takes for a person to make a decision increases and more errors are made, and reading rates decrease. Other studies show that fatigue results in personnel ignoring some signals because they develop their own subjective standards as to what is important, and as they become more fatigued they ignore more signals.

Inspections of personnel performance and training since the accident at Three Mile Island, have shown that in certain situations facility personnel are either required or allowd to remain on duty for extended periods of time.

Also, complaints have been received from some licensed nuclear power plant operators concerning the number of continuotss hours they have been on duty.

Licensee management is responsible for providing a sufficient number of trained personnel who are in the proper physical condition to operate and maintain the plant.

Licensee management should review their administrative procedures covering the working hours of nuclear power plant staff. These procedures should establish a sound policy covering working hours for plant staff who perform safety related functions (e.g., senior reactor operators, reactor operators, health physicists, auxiliary operators, I&C technicians, key maintenance personnel, etc.)

Subcommittee ANS-3 is currently developing criteria to address the subject of operator work hours.

These guidelines will become a part of ANSI N18.7.

The NRC is also considering issuing requirements for administrative procedures that would control staff overtime. Until either the ANSI Standard is issued and endorsed by NRC (via a Regulatory Guide) or separate requirements are issued by NRC, it is recommended that the following guidance be used. The guidance should be applied to all personnel performing a safety relcted function:

1.

Scheduled work should be limited to the following maximum work hours:

a.

An individual should not be permitted to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> straight.