Submits Info in Response to NRC ,Re small-break LOCA Analysis,Per NRC Action Plan Requirements
ML19344B550
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/16/1980
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0660, RTR-NUREG-660, TASK-2.K.3.30, TASK-2.K.3.31, TASK-TM TAC-45868, TAC-48209, NUDOCS 8010210443
Download: ML19344B550 (2)


Text

e-y 4

3 Y.

[-:C--.-

g--

L October 16, 1980

(-

Trojan Nuclear Plant l-Docket 50-344 License NPF-1

- Mr. Darrell G. Eisenhut, Director Division of Licensing-Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.. 20555-f

Dear Mr. Eisenhut:

_The NRC letter of September 5, 1980 provided preliminary clarifications l

and implementation schedules for the NRC Action Plan Requirements.. The i

following information is. submitted in response to the NRC requirement of l

the Action Plan Sections II.K.3.30 and II.K.3.31 regarding small-break l

LOCA analysis:

II.K.3.30 Revised Small-Break LOCA Models to Show Compliance L

With.10 CFR 50, Appendix K.-

l The present Westinghouse small-break LOCA model used to analyze I

the! Trojan plant is in comformance with 10 CFR 50, Appendix K.

[

However, in response to the requirement of the September 5, l

1980 NRC' letter, Westinghouse has indicated that they will address the specific NRC items for completion by January - 1, 1982.

A detailed outline of: the scope and schedule of this effort was provided to the1NRC by Westinghouse on September 26, 1980 -(T. M. Anderson's letter to' D. G. Eisenhut).

II.K.3.31 - Specific Calculation to Show Compliance With 10 CFR'50.46.

If the.results of the new Westinghouse model (and subsequent-lNRC~ review and' approval) indicate that,the present small-break

(

LOCA analysis.for.the Trojan plant is not in conformance with I

~10 CFR 50.46, a 'new analysis utilizing the new and approved E

,0 I

l 8010210 g 3 p

9

.g +.

^p-4 l

'l LDarrell G. Eisenhut October-16,:11980.-

l-Page~2' Y

Westinghouse model will be submitted to the NRC in accordance with.the.NRC schedule.

- Sincerely,

-/

//c I

c:

Mr. Robert A.. Clark Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory. Commission l

Mr. Lynn Frank, Director State'of Oregon Department of. Energy t

I,'

l' T

k l'

l l

I I

' 's 1

i L

.s 4

. i y

=

m-p e

--,3-.-,-

--q y-er g

9

-9

+

y-t'Te g

  1. e---+??

y